Ier GNR5C Operating Instructions Download Page 2

 Operating Instructions:           

GNR5C

 Sight-Glass Level Controller

 

 
SU0246.DOC   05/04 

Änderungen vorbehalten! 

 

 

 
 
 

GNR5C with Threaded Connectors: 

• 

Mount the top and bottom shut-off valves to the 
threaded connectors at the tank using suitable sealing 
materials. 

• 

Insert the 11 x 12 x 5 mm silicon discs into the shut-off 
valves. 

• 

Push the hose clamps for fastening the impact guard 
and the sleeve nuts, along with the silicon rings (which 
have been snapped into place inside the nuts), over 
the standpipe (see figure 2). 

• 

Insert the standpipe between the shut-off valves 
making sure that is square. 

• 

Check the length of the glass tube! The tube must fit 
flush against the silicon discs. Correct if necessary. 

• 

Push the sleeve nuts up to the shut-off valves and 
tighten (46 mm open-end wrench). 
Tighten the sleeve nuts. 

• 

Attach BSM 500 W… bistable switches if used (the 
cable gland must always point down). 

• 

Mount the transparent impact guard (see figure 2). 

• 

After the vessel has been filled, check all fittings for 
leaks! 

 
 

Maintenance: 
 

If used for its intended purpose, the GNR5C is 
maintenance-free. 
However, the magnetic float accumulates any magnetic 
particles which may be present in the medium over a 
period of time. In order to prevent operating errors, the 
float should be cleaned to remove magnetic particles at 
regular intervals. 

 

In order to clean the float, close both shut-off valves and 
empty the medium from the glass tube by opening the 
stopcock. 
 
Check the condition of the seals during reassembly and 
replace if necessary. 

 
 
 
 
 
 

 
 

 

Fig.. 2: 

GNR5C with Threaded Connectors:

 

 

 

 
IER Meß- und Regeltechnik 
Eberhard Henkel GmbH 
Innstrasse 2 
68199 Mannheim 

Tel.+49-(0)621-84224 0 

z

 Fax:+49-(0)621-84224 90 

e-mail: [email protected]   

z

   Internet: www.IER.de 

 

Reviews: