
IVS-100-BT Advanced Auto Data Server
Page 31
3.9 Power-On Procedure
3.9.1 Installation Checklist
WARNING:
Make sure a power supply with the correct input voltage is being fed into
the system. Incorrect voltages applied to the system may cause damage to
the internal electronic components and may also cause injury to the user.
To power on the IVS-100-BT, please make sure of the following:
The SIM card is installed
The bottom cover is installed
All peripheral devices (antenna, serial communications devices etc.) are
connected
The system is securely mounted
The power cables are plugged in
3.9.2 Power-on Procedure
To power-on the IVS-100-BT please follow the steps below:
Step 1:
Connect either the ACC power cable or the optional cigarette lighter power cable
from the IVS-100-BT to the vehicle.
Step 2:
To turn on the system, long press the power button for
five seconds
until the
power button lights up in blue. See
Summary of Contents for IVS-100-BT
Page 13: ...IVS 100 BT Advanced Auto Data Server Page 1 Chapter 1 1 Introduction ...
Page 21: ...IVS 100 BT Advanced Auto Data Server Page 9 Chapter 2 2 Unpacking ...
Page 26: ...IVS 100 BT Advanced Auto Data Server Page 14 Chapter 3 3 Installation ...
Page 45: ...IVS 100 BT Advanced Auto Data Server Page 33 Chapter 4 4 BIOS ...
Page 74: ...IVS 100 BT Advanced Auto Data Server Page 62 Chapter 5 5 Drivers and Utilities ...
Page 80: ...IVS 100 BT Advanced Auto Data Server Page 68 Chapter 6 6 Maintenance ...
Page 84: ...IVS 100 BT Advanced Auto Data Server Page 72 Chapter 7 7 Interface Connectors ...
Page 96: ...IVS 100 BT Advanced Auto Data Server Page 84 Appendix A A Regulatory Compliance ...
Page 100: ...IVS 100 BT Advanced Auto Data Server Page 88 Appendix B B Safety Precautions ...
Page 105: ...IVS 100 BT Advanced Auto Data Server Page 93 Appendix C C OBD II Reader Command ...
Page 114: ...IVS 100 BT Advanced Auto Data Server Page 102 Appendix D D Watchdog Timer ...
Page 117: ...IVS 100 BT Advanced Auto Data Server Page 105 Appendix E E Hazardous Materials Disclosure ...