ECW-281B Embedded System
Page 57
To power on the embedded system please make sure of the following:
The bottom surface panel is installed
All peripheral devices (VGA monitor, serial communications devices etc.) are
connected
The power cables are plugged in
The system is securely mounted
4.3.2 Terminal Block Pinouts
The terminal block pinouts are shown in
Figure 4-14
.
Figure 4-14: Terminal Block Pinouts
The chassis ground is connected to the ECW chassis internally. The cable ground is
connected to the ground pin on the input power connector of the power module.
4.3.3 Power-on Procedure
To power-on the ECW-281B-945GSE please follow the steps below:
Step 1:
Push the power button.
Step 2:
Once turned on, the power button should turns to blue. See
Figure 4-15
.
Step 0:
Summary of Contents for ECW-281B-945GSE
Page 16: ......
Page 17: ...ECW 281B Embedded System Page 1 Chapter 1 1 Introduction ...
Page 25: ...ECW 281B Embedded System Page 9 Chapter 2 2 Mechanical Description ...
Page 32: ...ECW 281B Embedded System Page 16 Figure 2 7 Internal Overview ...
Page 33: ...ECW 281B Embedded System Page 17 Chapter 3 3 System Components ...
Page 59: ...ECW 281B Embedded System Page 43 Chapter 4 4 Installation ...
Page 74: ...ECW 281B Embedded System Page 58 Figure 4 15 Power Button ...
Page 75: ...ECW 281B Embedded System Page 59 5 BIOS Screens Chapter 5 ...
Page 122: ...ECW 281B Embedded System Page 106 6 Software Drivers Chapter 6 ...
Page 142: ...ECW 281B Embedded System Page 126 Chapter 7 7 Troubleshooting and Maintenance ...
Page 148: ...ECW 281B Embedded System Page 132 A Safety Precautions Appendix A ...
Page 152: ...ECW 281B Embedded System Page 136 B IEI Embedded System Series Appendix B ...
Page 161: ...ECW 281B Embedded System Page 145 C BIOS Menu Options Appendix C ...
Page 165: ...ECW 281B Embedded System Page 149 D Watchdog Timer Appendix D ...