IEC miniReStoramod Installation, Operation & Maintenance Manual Download Page 26

Modular Hi-Rise Replacement Series – MIY

INSTALLATION, OPERATION, & MAINTENANCE MANUAL

26

TERMS AND CONDITIONS 

1.  Orders  shall  not  be  binding  upon  International  Environmental  Corporation,  an  Oklahoma 

corporation (hereinafter referred to as “IEC”) unless accepted by an authorized representative of 

IEC at its office in Oklahoma City, Oklahoma. No distributor, sales representative or any other 

person or entity (except authorized employees of IEC at its office in Oklahoma City, Oklahoma) 

has any authority whatsoever to bind IEC to any representation or agreement of any kind. 

 

2.  IEC  does  not  build  items  to  plans  and  specifications.  IEC  agrees  to  furnish  only  the  items  as 

described  in  IEC’s  acknowledgment  unless  IEC’s  office  in  Oklahoma  City,  Oklahoma  has 

previously received and accepted, in writing, approved submittals from Purchaser. 

 

3.  Prices  acknowledged  are  firm  only  if  Purchaser  releases  the  goods  covered  by  this  order  for 

immediate production by IEC within sixty (60) days from the date of Purchaser’s initial offer to 

purchase and for shipment by IEC within IEC’s estimated shipping date, unless otherwise agreed 

to in writing by IEC at its office in Oklahoma City, Oklahoma. If Purchaser does not meet the 

terms and conditions of this paragraph, the prices are subject to escalation to those prices in effect 

at time of shipment without notice to Purchaser. 

 

4.  All prices are F.O.B. IEC’s factory, unless otherwise agreed by IEC in writing; and, all payments 

and prices shall be in U.S.A. dollars. 

 

5.  If goods are released for production but IEC is prevented by the Purchaser from shipping upon 

completion  or  by  IEC’s  estimated  shipping  date,  whichever  is  later,  IEC  may  at  its  option,  in 

addition to all other remedies, invoice Purchaser to be payable within thirty (30) days and store the 

goods at Purchaser’s sole expense. 

 

6.  Title to and risk of loss to the goods passes to the Purchaser F.O.B. IEC’s factory. 

 

7. 

Disclaimer

 

 

It  is  expressly  understood  that  unless  a  statement  is  specifically  identified  as  a  warranty, 

statements made by IEC or its representatives relating to IEC’s products, whether oral, written or 

contained in any sales literature, catalog or any other agreement, are not express warranties and do 

not  form  a  part  of  the  basis  of  the  bargain,  but  are  merely  IEC’s  opinion  or  commendation  of 

IEC’s  products. 

EXCEPT  AS  SPECIFICALLY  SET  FORTH  HEREIN,  THERE  IS  NO 

EXPRESS  WARRANTY  AS  TO  ANY  OF  IEC’S  PRODUCTS.  IEC  MAKES  NO 

WARRANTY  AGAINST  LATENT  DEFECTS.  IEC  MAKES  NO  WARRANTY  OF 

MERCHANTABILITY OF THE GOODS OR OF THE FITNESS OF THE GOODS FOR 

ANY PARTICULAR PURPOSE. 

 

8. 

Grant of Limited Express Warranty 

 

IEC warrants IEC products purchased and retained in the United States of America and Canada to 

be free from defects in material and workmanship under normal use and maintenance as follows: 

(1) All complete fan coil units built or sold by IEC for twelve (12) months from date of unit start 

up or eighteen (18) months from date of shipment (from factory), whichever comes first. 

 

 

All parts must be returned to IEC’s factory in Oklahoma City, Oklahoma, freight prepaid, no later 

than  sixty  (60)  days  after  the  date  of  the  failure  of  the  part;  if  IEC  determines  the  part  to  be 

defective and within IEC’s Limited Express Warranty, IEC shall, when such part has been either 

replaced or repaired, return such to a factory recognized contractor or service organization, F.O.B. 

IEC’s factory, Oklahoma City, Oklahoma, freight prepaid. The warranty on any parts repaired or 

replaced under warranty expires at the end of the original warranty period. For information and 

warranty service contact: 

 

International Environmental Corporation 

Customer Service 

5000 West I-40 

Oklahoma City, OK  73128 

(405) 605-5000 

 

 

This  warranty  does  not  cover  and  does  not  apply  to:  (1)  Air  filters,  fuses,  fluids;  (2)  Products 

relocated after initial installation; (3) Any portion or component of any system that is not supplied 

by IEC, regardless of the cause of the failure of such portion or component; (4) Products on which 

the  unit  identification  tags  or  labels  have  been  removed  or  defaced;  (5)  Products  on  which 

payment to IEC is or has been in default; (6) Products which have defects or damage which result 

from  improper  installation,  wiring,  electrical  imbalance  characteristics  or  maintenance;  or  are 

caused by accident, misuse or abuse, fire, flood, alteration or misapplication of the product; (7) 

Products  which  have  defects  or  damage  which  result  from  a  contaminated  or  corrosive  air  or 

liquid supply or operation at abnormal temperatures; (8) Mold, fungus or bacteria damages; (9) 

Products subjected to  corrosion or abrasion;  (10) Products  manufactured or supplied by others; 

(11) Products which have been subjected to misuse, negligence or accidents; (12) Products which 

have been operated in a  manner contrary  to IEC’s printed instructions; or (13) Products which 

have defects, damage or insufficient performance as a result of insufficient or incorrect system 

design or the improper application of IEC’s products. 

 

 

IEC is not responsible for: (1) The cost of any fluids or other system components, or associated 

labor to repair or replace the same, which is incurred as a result of a defective part covered by 

IEC’s Limited Express Warranty;  (2) The costs of labor, materials or service incurred in removal 

of the defective part, or in obtaining and replacing the new or repaired part; or, (3) Transportation 

costs of the defective part from the installation site to IEC or of the return of any part not covered 

by IEC’s Limited Express Warranty. 

 

Limitation:

  This  Limited  Express  Warranty  is  given  in  lieu  of  all  other  warranties.  If, 

notwithstanding the disclaimers contained herein, it is determined that other warranties exist, any 

such warranties, including without limitation any express warranties or any implied warranties of 

fitness for particular purpose and merchantability, shall be limited to the duration of the Limited 

Express Warranty. 

 

9. 

Limitation of Remedies

 

 

In the event of a breach of the Limited Express Warranty, IEC will only be obligated at IEC’s 

option to repair the failed part or unit or to furnish a new or rebuilt part or unit in exchange for the 

part or unit which has failed. If after written notice to IEC’s factory in Oklahoma City, Oklahoma 

of each defect, malfunction or other failure and a reasonable number of attempts by IEC to correct 

the  defect,  malfunction  or  other  failure  and the  remedy  fails  of  its  essential  purpose,  IEC  shall 

refund the purchase price paid to IEC in exchange for the return of the sold good(s). Said refund 

shall  be  the  maximum  liability  of  IEC. 

THIS  REMEDY  IS  THE  SOLE  AND  EXCLUSIVE 

REMEDY OF THE BUYER OR THEIR PURCHASER AGAINST IEC FOR BREACH OF 

CONTRACT, FOR BREACH OF ANY WARRANTY OR FOR IEC’S NEGLIGENCE OR 

IN STRICT LIABILITY. 

 

10. 

Limitation of Liability

 

 

IEC shall have no liability for any damages if IEC’s performance is delayed for any reason or is 

prevented to any extent by any event such as, but not limited to: any war, civil unrest, government 

restrictions  or  restraints,  strikes,  or  work  stoppages,  fire,  flood,  accident,  shortages  of 

transportation, fuel, material or labor, acts of God or any other reason beyond the sole control of 

IEC. 

IEC  EXPRESSLY  DISCLAIMS  AND  EXCLUDES  ANY  LIABILITY  FOR 

CONSEQUENTIAL  OR  INCIDENTAL  DAMAGE  IN  CONTRACT,  FOR  BREACH  OF 

ANY  EXPRESS  OR  IMPLIED  WARRANTY,  OR  IN  TORT,  WHETHER  FOR  IEC’s 

NEGLIGENCE OR AS STRICT LIABILITY. 

 

11.  IEC shall have no system design, application or maintenance responsibility or responsibility for 

mold, fungus or bacteria to Purchaser or any other third party. 

 

12.  All  sales,  goods  and  services,  use,  excise,  value  added,  transportation,  privilege,  occupational 

consumption, storage,  document, transaction  or other taxes  which  may  be  levied by any taxing 

authority as a result of this transaction shall be paid by the Purchaser. 

 

13.  Unless otherwise agreed to in writing by IEC any technical data furnished in conjunction with this 

order and not obtainable from another source shall not be duplicated, used, or disclosed in whole 

or in part for any purpose other than to evaluate this order. 

 

14.  IEC shall have no liability or other obligation hereunder, if IEC’s performance is delayed for any 

reason or is prevented to any extent by any event such as, but not limited to: any act of God, strike 

or  work  stoppage,  fire,  flood,  accident,  allocation,  or  other  controls  of  Government  authorities, 

shortages of transportation, fuel, material or labor, or any other cause beyond IEC’s sole control. 

Any shipping date stated by IEC is IEC’s best estimate but IEC makes no guarantee of shipment 

by any such date and shall have no liability or other obligation for failure to ship on such date, 

regardless of cause. 

 

15.  Payment terms are net thirty (30) days from date of shipment on approved credit. One and one 

half percent (1 1/2%) per month (18% annual rate) may be charged on past due accounts or the 

highest rate permitted by applicable law, whichever is lesser. In the event the account is placed for 

collection, Purchaser shall be responsible for all reasonable attorneys fees or costs on a solicitor 

and client basis, plus all other costs and expenses incurred by IEC in securing payment. 

 

16.  Purchaser  shall  not  cancel  the  contract  without  prior  written  consent  of  an  authorized 

representative of IEC at its offices in Oklahoma City, Oklahoma. In the event Purchaser cancels 

the  contract  with  the  prior  written  consent  of  IEC  after  the  Purchaser’s  offer  to  purchase  is 

received and acknowledged in writing, IEC shall be entitled to receive from Purchaser IEC’s cost 

incurred to time of cancellation plus a reasonable allowance for overhead and profit. 

 

17.  Purchaser shall not assign any of its interest or rights under this agreement without written consent 

of IEC. 

 

18.  IEC will protect all its lien rights. IEC will not furnish lien waivers or releases until IEC receives 

payment, in full, at its office in Oklahoma City, Oklahoma from Purchaser for the goods covered 

by this order. There is no authorized retainage for any reason. 

 

19.  This Agreement shall be construed, and the rights and liabilities of the parties hereunder shall be 

determined in accordance with the laws of the State of Oklahoma. If it shall be found that any 

portion of this agreement violates any particular law of the United States or any state in the United 

States  having  jurisdiction  or,  if  applicable,  any  law  of  Canada  or  any  province  or  territory  in 

Canada having jurisdiction, such portion of the agreement shall be of no force and effect in that 

political  unit,  division  or  sub-division  in  which  they  are  illegal  or  unenforceable  and  the 

agreement shall be treated as if such portion or portions had not been inserted. In the event that 

any dispute or disagreement in connection with any order should arise or exist between Purchaser 

and IEC, jurisdiction and venue for any legal action shall be, if IEC so elects, exclusively in the 

state or federal courts in Oklahoma County, Oklahoma. The statute of limitations on any claim of 

the Purchaser against the IEC shall be one (1) year from the date the cause of action accrues. 

 

20.  Without  regard  to  any  other  agreement,  all  obligations  of  Purchaser  to  IEC  shall  become 

immediately  due  and  payable  if  Purchaser  becomes  insolvent  or  if  Purchaser  does  not  make 

payments when due or breaches any other agreement or fails to perform any obligation. 

 

21.  All orders are expressly limited and made conditional upon acceptance by Purchaser of the terms 

and conditions set forth above without change. There shall be no understandings, agreements, or 

obligations  (outside  these  terms  and  conditions)  unless  specifically  set  forth  in  writing  and 

accepted by signature of an authorized representative of IEC in Oklahoma City, Oklahoma. 

 

22.  The parties hereto have requested that these presents and all judicial proceedings relating thereto 

be  drafted  in  English.  Les  parties  aux  présentes  ont  demandé  à  ce  que  les  présentes  et  toutes 

procedures judiciaires y afférentes soient rédigées en anglais 

Forms\IEC\Standard Forms\Word Files\IEC Terms and Conditions 1-Page 09-10.doc 

 

Summary of Contents for miniReStoramod

Page 1: ...Build Your Reputation on Ours Modular Hi Rise Replacement Series MIY INSTALLATION OPERATION MAINTENANCE MANUAL miniReStoramod ...

Page 2: ...ndependently In addition some systems may require repeated venting over a period of time to properly eliminate air from the system 15 Failure to provide proper water quality will void the fan coil unit s warranty 1 No attempt should be made to handle install or service any unit without following safe practices regarding mechanical equipment 2 WARNING Wear eye hand and limb protection at all times ...

Page 3: ...Start Up 25 Recommended Spare Parts per 10 units 26 Terms and Conditions 2 Warnings and Cautions SECTION ONE Receipt Unpacking Inspection 4 Receipt 4 Unpacking and Inspection 5 Handling 6 Potential Unit Configurations 7 Special Arrangment Options SECTION TWO Product Line Specific Demolition Installation 10 Demolition Step by Step Guide 11 Installation 14 Riser to Unit Installation 14 Riser to Drai...

Page 4: ... inert fluid or gas such as clear water or dry nitrogen to avoid possible damage or injury in the event of a leak or component failure during testing Always protect adjacent flammable material when welding or soldering Use a suitable heat shield material to contain sparks or drops of solder Have a fire extinguisher readily available The manufacturer assumes no responsibility for personal injury or...

Page 5: ... that no force or pressure be applied to the coil or piping during handling Depending on the options and accessories some units could contain delicate components that may be damaged by improper handling Lifting or supporting the cabinet only at the top and bottom should be avoided to maintain the straight and square cabinet alignment The equipment covered in this manual IS NOT suitable for outdoor...

Page 6: ...t Sup 90 90 HS D CR CS HR HS HR CR D CS H1 H1 HS HR CR D CS H1 Sup Ret Ret Sup 90 90 Sup Ret HS D CR CS HR S1 Sup Ret S1 S1 HS HR CR D CS Sup Ret HS HR CR D CS Ret Sup 90 90 HS D CR CS HR Single side and Top Supply Top Supply Only HS HR CR D CS C2 Sup Ret Supply Ret Sup HS HR CR D CS C2 Ret Sup Sup 90 90 C2 Sup HS D CR CS HR HS HR CR D CS HS HR CR D CS M2 Sup Ret Ret Sup Sup Supply M2 M2 Supply 90...

Page 7: ...t Sup Ret Sup 90 HS D CR CS HR 90 HS HR CR D CS Q1 HS HR CR D CS Q1 Q1 90 HS D CR CS HR 90 Sup Ret Ret Sup Sup Ret HS HR CR D CS E2 HS HR CR D CS E2 E2 Ret Sup Ret Sup Ret Sup 90 HS D CR CS HR 90 E2 Supply Supply Supply HS HR CR D CS F2 HS HR CR D CS F2 F2 Ret Sup Ret Sup Ret Sup 90 HS D CR CS HR 90 Supply Supply Supply HS HR CR D CS J2 HS HR CR D CS J2 J2 Ret Sup Ret Sup Ret Sup 90 HS D CR CS HR ...

Page 8: ... Ret Sup K2 K2 90 90 Sup Ret HS D CR CS HR Sup Sup Sup HS HR CR D CS P2 HS HR CR D CS P2 P2 90 HS D CR CS HR 90 Sup Ret Ret Sup Sup Ret Sup Sup Sup Sup Ret HS HR CR D CS Q2 Sup Ret HS HR CR D CS Q2 Q2 90 90 Ret Sup HS D CR CS HR Sup Sup Sup Sup Ret HS HR CR D CS T2 Sup Ret HS HR CR D CS T2 T2 90 90 Ret Sup HS D CR CS HR Sup Sup Sup Double side and Top Supply HS HR CR D CS B3 HS HR CR D CS B3 B3 Su...

Page 9: ...t IEC for pricing and availability 2 Any special suply return arrangement may affect sound and performance 3 Risers pictured are shown for reference purposes only and adhere to the IEC standard convention 4 MRY MIY equipment is designed to use existing risers so risers are typically not sold with these models 5 Riser supply return configurations and temperatures should be labeled prior to demoliti...

Page 10: ...placement will be 81 5 x 15 5 on most original units although every application may vary 4 Carefully cut drywall at outer edges of unit along penciled outline removing drywall from the floor to the top of existing fan coil unit to expose the entire front face 5 Cut and remove the upper front steel cabinet panel flush with the sidewall of the existing unit 6 Cut copper supply and return pipes with ...

Page 11: ...of the new unit appropriate height and side orientation 7 Thoroughly check the old unit chassis and drywall cuts for any irregularities or protrusions that would prevent the new unit from sliding in seating and properly leveled 8 Attach the louvered deco panel frame onto the new slip in replacement chassis Be sure to remove the lower shipping brace bar from the deco frame before it is installed 9 ...

Page 12: ... that no leaks are present 18 Purge water coils of air after isolation valves are opened to allow flow All models come with a manual air vent at minimum 19 Seal any remaining chassis openings as well as possible to minimize air leakage that would adversely affect unit performance 20 Make all high voltage electrical connections followed by low voltage connections 21 Reconnect electrical service at ...

Page 13: ...ansition Panel 25 Attach the louvered return air deco panel to the new chassis using both of the 5 16 hex cam locks 26 Installation complete Clean up work area Submittals and product literature detailing unit operation controls and connections should be thoroughly reviewed BEFORE beginning the connection and testing of risers and piping To assure optimal unit performance the supply connection s ar...

Page 14: ...le Connection point to any factory furnished and installed components Coil Figure 9 Back up Wrench Ball Valve Wrench Swivel Connection Riser to Drain Installation Figure 10 Drain Pan Drain Clamp Clamp Riser Knockout Unit Insulation P Trap Unit Wall Riser Riser Stubout 1 After the applicable Supply Return and Drain pipe knockouts have been removed carefully position the unit so that the riser ball ...

Page 15: ... When testing with air or some other gas it might be necessary to tighten stem packing nuts on some valves to maintain air pressure in the riser Pressure testing risers with water should be done with the unit service valves closed to prevent flushing debris into the unit valve packages All leaks should be repaired before proceeding with the unit installation 13 After system integrity has been esta...

Page 16: ... paint product stores It should be noted that the more conscientiously this preparation is done the more effective it will be After this preparation is accomplished the factory finish should provide excellent adhesion for a variety of air dried top coats Enamel will give a more durable higher gloss finish while latex will not adhere as well and will give a dull softer finish Factory aerosol touch ...

Page 17: ... up operations Air System Balancing All duct stubs grilles filters and return access panels must be properly installed to establish actual system operating conditions BEFORE beginning air balancing operations Each individual unit and the attached ductwork is a unique system with its own operating characteristics For this reason air balancing is normally done by balance specialists who are familiar...

Page 18: ...lues will typically result in higher sound power values than what are published by the manufacturer 4 Pleasae contact the Factory for special CFM or external static pressure applications Unit Model of Coil Rows Unit Voltage Pot Board Settings VDC Values 0 ESP CFM Values 0 ESP High Medium Low High Medium Low MIY04 3 120V 1 60 6 37 5 29 3 65 386 303 203 MIY04 4 120V 1 60 6 28 5 21 3 63 380 301 202 M...

Page 19: ... result in higher sound power values than what are published by the manufacturer 4 Please contact the Factory for special CFM or external static pressure applications Unit Model and Size Total of Coil Rows Unit Voltage V PH Hz Proportional Analog T stat Fan Speed Limits VDC Tested CFM values at 0 ESP Max Min High Low MIY04 3 120V 1 60 6 37 3 65 386 203 MIY04 4 120V 1 60 6 28 3 63 380 202 MIY04 5 1...

Page 20: ...cing technique may vary from one system to another After the proper system operation is established the appropriate system operating conditions such as various water temperatures and flow rates should be recorded in a convenient place for future reference Before and during water system balancing conditions may exist due to incorrect system pressures which may result in noticeable water noise or un...

Page 21: ...ield lubrication is required Figure 13 Motor Blower Slide Out A Disconnect Plugs B Internal Circuit Breaker Should the assembly require more extensive service it is designed to slide out of the unit and be removed from the unit if necessary by disconnecting plugs see A shown in Figure 13 Remember to turn off the power to the unit and lockout the internal circuit breaker of the unit see B also show...

Page 22: ...components and wiring of the unit This may vary from unit to unit Consult the wiring diagram attached to the unit for the actual type and number of controls provided on each unit The wiring diagram is affixed to the acoustical RA block off panel inside the unit It is visible when the return air panel is removed The wiring and controls are accessible through the flip down control box door see Figur...

Page 23: ... discarded when dirty The optional factory permanent filter may be cleaned in hot soapy water to remove any trapped dirt It should then be set aside on edge to dry Before replacing the filter in the unit it should be recharged with some type of entrapment film such as Film Cor Recharging Oil The filter should be sprayed on both sides or submerged in the film to assure complete coverage The filter ...

Page 24: ...including any numbers On warranty replacements in addition to the information previously listed the unit shipping code which appears on the upper right hand corner of the serial plate is required Contact the factory for authorization to return any parts such as defective parts replaced in warranty All shipments returned to the factory must be marked with a Return Authorization Number which is prov...

Page 25: ... diagram Incoming power service or services are connected Install and connect furnish only parts which have not been factory installed Unit Start Up General visual unit and system inspection Check for proper fan rotation Record electrical supply voltage Check all wiring for secure connections Close all unit isolation valves Flush water systems Fill systems with water refrigerant Vent water systems...

Page 26: ... In the event of a breach of the Limited Express Warranty IEC will only be obligated at IEC s option to repair the failed part or unit or to furnish a new or rebuilt part or unit in exchange for the part or unit which has failed If after written notice to IEC s factory in Oklahoma City Oklahoma of each defect malfunction or other failure and a reasonable number of attempts by IEC to correct the de...

Page 27: ...Modular Hi Rise Replacement Series MIY INSTALLATION OPERATION MAINTENANCE MANUAL 27 This page intentionally left blank ...

Page 28: ...ies MIY INSTALLATION OPERATION MAINTENANCE MANUAL Contact your local IEC Sales Representative for further details and pricing applicable to this product Visit our website iec okc com to find your local IEC Sales Rep IEC Part Number I100 90023660 IOM 056 Revision 9 9 2020 2016 2020 International Environmental Corporation IEC ...

Reviews: