5-4-4- Replacement of secondary fuses
WARNING:
RISK OF ELECTRIC SHOCK
It is essential for the mains connection to be unplugged during replacement of fuses.
•
Turn o
ff
the analyser and unplug the power cable.
•
Remove the screws from the secondary fuse protection plate located on the right-hand side of the analyser
and gently prize the plate away using a flat head screwdriver.
•
Insert a flat head screwdriver into the fuse-holder and turn anti-clockwise to unscrew.
•
Take out the fuse-holder and replace the faulty fuse with one of the same value and the same type (time-
delay fuse).
•
Return fuse-holder to its housing and screw firmly into place, taking care not to over-tighten.
•
Replace the fuse protection plate.
•
Switch the analyser back on again and perform the start-up procedure.
Maintenance
5-4-
Analyser Interventions
(continued)
IDS-iSYS User Manual - Revision M1
Maintenance 5-4
129
Software version V 14
Summary of Contents for IDS-iSYS
Page 7: ......
Page 13: ...SECTION 1 Operating principle...
Page 30: ...SECTION 2 User Interface Software...
Page 48: ...SECTION 3 Use...
Page 119: ...SECTION 4 Messages...
Page 130: ...SECTION 5 Maintenance...
Page 165: ...SECTION 6 Problems Corrective Action...
Page 169: ...SECTION 7 System Configuration...
Page 182: ...Appendices...