
Installation & Startup:
Complete the following prior to iDRY Systems assisted startup procedure:
Placement
Track & Trolley Installation
1
Locate Kiln Chamber in Dry, Climate controlled space at recommended temperature of 70 DegF
/ 21.1 C
2
Loosen Handwheels just enough to rotate them out of the way (if you continue to loosen the
threads the hand wheels will come o
ff
.
3
Shim chamber to ensure water flows to drain (chamber is pre-shimmed 1/2inch / 1.27cm)
4
Remove the ratchet Straps, then remove Track, Trolley and Bridge sections from chamber. Set
aside the cardboard box.
4
The two pieces on top are called the track bridge extensions.
5
Match up the track bridges to the chamber and the track frame using the two alignment tabs.
6
Adjust the track feet so that both the track and bridge are level leading up to the kiln chamber.
*You will need either an adjustable wrench or an 1-1/8inch / 29mm wrench. All feet should be
on the ground *The track can be used with, or without the track bridge extensions.
iDRY Turbo User Manual
© 2021 iDRY, LLC
11