Installation Steps at a Glance
•
Ensure the iQ LTE Satellite Router has adequate ventilation.
•
Do not install the iQ LTE Satellite Router on the floor.
•
Select a suitable dust free location.
•
To protect the equipment and to avoid personal injury, observe the physical and
environmental considerations below when installing an iQ LTE Satellite Router:
•
Ventilation
A single-core protective vent on the back of the chassis provides pressure equalization
and allows reliable operation of the product. To protect the chassis from overheating
do not place this product in a built-in installation, such as a bookcase or enclosed
rack, unless proper ventilation is provided or the manufacturer instructions have been
followed.
•
Power Cord Protection
Route power supply cords so they will not be walked on or pinched; pay particular
attention to cords at plugs, convenience receptacles, and at the exit points.
•
Overloading
Do not overload wall outlets, extension cords, or integral convenience receptacles.
•
Heat
Do not place the iQ LTE Satellite Router near heat sources, such as radiators, heat
registers, stoves, or other products (including amplifiers) that produce heat.
•
Attachments
Do not use attachments unless recommended by the manufacturer.
•
Grounding
Never defeat the ground conductor or operate the equipment without a suitably
installed ground conductor. Contact the appropriate electrical inspection authority or
an electrician if it is uncertain that suitable grounding is available.
4.1.2
Installation Checklist
1.
Unpack the router according to the unpacking instructions in
2.
Account for all components for the installation. A typical list is given in
Components Typically Included in an Order
3.
The recommended tools should be available for installation. See
Supplies Required for Installation
.
4.
Prepare the coax cables as directed in
to
connect to
RX IN
and
TX Out.
NOTE:
The iQ LTE Satellite Router is designed to be installed in a sheltered
environment per environmental specifications. See
.
NOTE:
Where applicable, mating connectors must be prepared for
installation. See
and
(for routers with DC power supply options, only).
Summary of Contents for iQ LTE Series
Page 4: ...iv Installation Support and Maintenance Guide iQ LTE Satellite Router Revision History...
Page 10: ...x Installation Support and Maintenance Guide iQ LTE Satellite Router Tables...
Page 18: ...4 Installation Support and Maintenance Guide iQ LTE Satellite Router Power Supply Options...
Page 52: ...38 Installation Support and Maintenance Guide iQ LTE Satellite Router...
Page 64: ...50 Installation Support and Maintenance Guide iQ LTE Satellite Router...
Page 68: ...54 Installation Support and Maintenance Guide iQ LTE Satellite Router...
Page 69: ......
Page 70: ......