©HALE PRODUCTS, INC. Our policy is one of continuous development. We therefore
reserve the right to amend specifications without notice or obligation.
5. Once you have finished steps 1-4, press the save button. The display that was selected to be
the default master will take you back to the home screen, and can be used as normal.
The secondary displays will show the screen pictured below.
(b)
Operation
1. After the multi-display system is configured, the default master display can be used as normal.
All of the secondary displays will remain inactive.
2. To take control of the system from one of the secondary displays, hit the Take Control Button
(see step 5 of setup).
3. If the system is currently not running an operation (Foam/CAFS is turned OFF), the display that
took control will bring up the start page and can be used as the main display.
The display that was previously the master will now display the screen shown in step 5 of setup.
4. If the system is running an operation, the display that took control will be showing the operation
screen. This display can now be used to control the operation.
The display that was previously the master will now display the screen shown in step 5 of setup.
5. If the system is currently in flush, the secondary displays cannot take control. The operator must
wait for the flush to finish. When the system is in flush, the secondary displays will show the
warning message pictured below.
Display Number
Summary of Contents for HALE SmartCAFS
Page 106: ......