ICP DAS PMC-523x/PMC-224x/PMD Series User Manual
65
the Contract Capacity function, click on “Enable” and input the Contract
Capacity. Click “Save” button to save the settings. The Contract
Capacity being set will be displayed on the System Setting main page.
Demand Interval Setting
In this section, it allows to set Demand Interval Setting. The system will
calculate the demand according to this demand interval. The default
interval is 15 minutes; the user could set the interval to be 15/30/60
minutes. Click “Save” button to save the settings.
Carbon Footprint Setting
In this section, it allows to set Carbon Footprint Setting. Please input the
Carbon Footprint factor based on the Carbon Footprint factors for
countries worldwide that the International Energy Agency (IEA)
published.
6.7
Power Meter Group Setting
The power meter group setting function allows user to create groups that
contain specific loops/phases of power meters for easy group classification.
These pre-set groups can be inquired in “Power Data Information” and
“Historical Electricity Analysis” pages for power data analysis. The power
meter group setting page is shown as below:
Figure6-22 :
Power Meter Group Setting
Please refer to the following chapters to setup the group/subgroup and click
the “Save” button to save the changes.
6.7.1
Group and Subgroup Viewing
Click the group or subgroup bar to expand/hide the lists.
Summary of Contents for PMC-523 Series
Page 1: ...ICP DAS PMC 523x PMC 224x PMD Power Meter Concentrator Series User Manual Version 3 2 4...
Page 165: ...ICP DAS PMC 523x PMC 224x PMD Series User Manual 150 Figure9 14 The Import of MQTT Topic...
Page 205: ...ICP DAS PMC 523x PMC 224x PMD Series User Manual 190 Figure10 53 PUE Setting Page 2...