PROPULSION / ENGINE
16-57
CHANGE C2
ICON A5 / MAINTENANCE MANUAL
CH
AP
TER
1
6
Use illustrations as a reference for the oil cooler installation with some of its main components.
3.
Replace engine cowling.
V
ERIFICATION
M
ETHOD
:
Acceptable condition of hoses/tubes and leak-free installation provide verification of completion.
R
ELATED
I
NFORMATION
:
"Condition and 100-Hour Inspection—Operational Inspection" on page 3-25
"Remove Engine Cowlings" on page 16-13
"Install Engine Cowlings" on page 16-16
16.1.7.2 Maintenance Instructions
16.1.7.2.1
Engine Coolant Replacement
This procedure covers draining coolant from the engine and radiator, overflow bottle, and ECS system.
Perform all three or only the ones that are required for the specific maintenance situation.
T
ASK
I
NFORMATION
:
Type of Maintenance
Line
Summary of Contents for A5
Page 4: ...IV TABLE OF CONTENTS ICON A5 MAINTENANCE MANUAL ISSUE C3...
Page 112: ...3 60 INSPECTIONS SYSTEM SPECIFIC INSPECTIONS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 3...
Page 342: ...9 106 FLIGHT CONTROLS YAW CONTROLS ICON A5 MAINTENANCE MANUAL CHANGE C3 CHAPTER 9...
Page 398: ...11 20 FUSELAGE AND VERTICAL TAIL WATER RUDDER ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 11...
Page 420: ...12 22 HORIZONTAL TAIL HORIZONTAL TAIL TIP PIN ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 12...
Page 608: ...14 100 LANDING GEAR AFT NOSE LANDING GEAR DOOR ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 14...
Page 627: ...PROPULSION 16 3 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 16 Install Spinner Dome 16 106...
Page 658: ...16 34 PROPULSION ENGINE ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 16 FIGURE 16 20...
Page 659: ...PROPULSION ENGINE 16 35 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 16 THROTTLE ASSEMBLY...
Page 732: ...16 108 PROPULSION PROPELLER ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 16...