Installation
14
CONTROL PANEL INSTALLATION
NOTE
The image of the control panel is only indicative as it may vary depending on the installed model.
1
1
5
6
2
3
9
4
8
7
–
Choose the installation side of the control panel (RH or LH), remove the covers (1) and break the pre-cut opening (2)
–
take the arm kit complete with support (3) from the inside of the furnace.
–
open the control panel (4) and cut the window prearranged on the rear side
–
route the bulbs (5) of the thermostat and thermometer through the window, then insert them in the square pipe of the
support and, through the upper openings, route them in the protection pipe until reaching the pockets (6). Then lock with
specific clamps to prevent them from being pulled out
–
connect the burner cables (7) to the control panel using a protection sheath and lock them with cable rings (8)
–
fasten the control panel to the support (3) with the kit supplied
–
fasten with two screws (9) the arm-control panel unit to the boiler upper part
–
refit the covers (1).
The bracket supplied, equipped with shaped plate with double drilling, allows installing the panels at two inclinations, choosing
the preferred position (see figures).