b.
Close
the
lever
until
the
pull-ring
latch
locks
in
place.
Make
sure
that
the
lever
locks
into
place
in
the
storage-server
chassis.
3.
Wrap
the
strain-relief
clamp
around
the
power
cord
approximately
20
cm
(8
in.)
from
the
power-supply
connection
end.
4.
Attach
the
power-supply
nut
and
tighten
it
securely.
5.
Connect
the
power
cord
to
the
AC
power
connector.
See
Figure
96.
6.
Plug
the
power
cord
into
a
properly
grounded
electrical
outlet.
7.
Turn
on
the
power-supply
switch.
8.
Make
sure
that
the
green
Power
LED
on
the
new
power-supply
CRU
is
on
and
the
amber
Fault
LED
is
off.
v
If
the
Power
LED
is
off,
the
power-supply
CRU
might
not
be
installed
correctly.
Remove
it
and
then
reinstall
it.
v
If
the
Fault
LED
is
on
or
the
Power
LED
stays
off,
see
the
Storage
Manager
client
for
problem
determination.
For
more
information
about
the
LEDs,
see
“Checking
the
LEDs”
on
page
97.
Working
with
hot-swap
RAID
controllers
(dual-controller
models
only)
Each
RAID
controller
fits
into
the
back
of
the
storage
subsystem
and
has
the
following
components:
v
Battery
v
Cache
memory
v
Two
host
ports
and
one
expansion
port
v
One
Ethernet
port
v
One
serial
port
Exception:
The
DS4300
single-controller
storage
subsystem
(Model
6LU/6LX)
has
only
one
RAID
controller.
Therefore,
you
cannot
hot
swap
the
RAID
controller.
Each
RAID
controller
has
a
unique
hardware
Ethernet
address,
which
is
printed
on
a
label
on
the
front.
There
is
also
a
label
giving
the
cache
battery
manufacturing
and
installation
dates
on
the
top
of
the
controller
unit.
Figure
97
on
page
135
shows
the
location
of
these
items.
AC power
connector
AC power
switch
Strain-relief
clamp
Lever
-
Figure
96.
Connecting
the
power
cord
to
the
AC
power
connector
134
IBM
TotalStorage
DS4300
Fibre
Channel
Storage
Subsystem:
Installation,
User’s,
and
Maintenance
Guide
Summary of Contents for TotalStorage DS4300 Turbo
Page 2: ......
Page 219: ......
Page 220: ...Part Number 42D3300 Printed in USA GC26 7722 02 1P P N 42D3300...