background image

Attention:

  

Do

 

not

 

route

 

the

 

cables

 

in

 

front

 

of

 

the

 

air

 

exhaust

 

vent,

 

which

 

is

 

located

 

at

 

the

 

top

 

of

 

the

 

port

 

side

 

of

 

the

 

chassis.

 

The

 

minimum

 

bend

 

radius

 

for

 

a

 

50–micron

 

cable

 

is

 

3.05

 

cm

 

(2

 

in.)

 

under

 

full

 

tensile

 

load,

 

and

 

3.048

 

cm

 

(1.2

 

in.)

 

with

 

no

 

tensile

 

load.

 

Do

 

not

 

use

 

tie

 

wraps

 

for

 

optical

 

cables

 

because

 

they

 

are

 

easily

 

overtightened.

 

Interpreting

 

LED

 

activity

 

You

 

can

 

determine

 

system

 

activity

 

and

 

status

 

by

 

monitoring

 

the

 

activity

 

of

 

the

 

LEDs

 

on

 

the

 

switch.

 

There

 

are

 

four

 

possible

 

LED

 

states:

 

v

   

No

 

light

 

v

   

Steady

 

light

 

in

 

one

 

of

 

the

 

following

 

colors:

 

   

Green

 

   

Amber

 

   

Yellow

 

(displays

 

when

 

both

 

green

 

and

 

amber

 

LED

 

elements

 

are

 

lit)

v

   

Slow-flashing

 

light

 

(green,

 

amber,

 

or

 

yellow)

 

v

   

Fast-flashing

 

light

 

(green,

 

amber,

 

or

 

yellow)

The

 

LEDs

 

can

 

flash

 

green,

 

yellow,

 

or

 

amber

 

while

 

the

 

switch

 

is

 

starting

 

or

 

while

 

a

 

POST

 

or

 

other

 

diagnostic

 

tests

 

are

 

running.

 

This

 

is

 

normal.

 

It

 

does

 

not

 

indicate

 

a

 

problem

 

unless

 

the

 

LEDs

 

do

 

not

 

indicate

 

that

 

all

 

components

 

are

 

operational

 

after

 

the

 

switch

 

is

 

started,

 

after

 

a

 

POST,

 

or

 

after

 

any

 

diagnostic

 

tests

 

are

 

complete.

 

See

 

the

 

error

 

log

 

for

 

any

 

errors.

 

For

 

information

 

about

 

the

 

error

 

log,

 

see

 

the

 

Brocade

 

Diagnostic

 

and

 

System

 

Error

 

Message

 

Reference

.

 

LEDs

 

on

 

the

 

16–port

 

card

 

The

 

following

 

LEDs

 

are

 

on

 

the

 

16–port

 

card:

 

v

   

Power

 

LED

 

v

   

Status

 

LED

 

v

   

Port

 

speed

 

LED

 

for

 

each

 

port

 

v

   

Port

 

status

 

LED

 

for

 

each

 

port

Note:

  

The

 

LED

 

patterns

 

can

 

temporarily

 

change

 

during

 

a

 

POST

 

and

 

other

 

diagnostic

 

tests.

 

Figure

 

14

 

on

 

page

 

21

 

shows

 

the

 

location

 

of

 

the

 

LEDs

 

on

 

the

 

16–port

 

card.

    

20

 

IBM

 

TotalStorage

 

SAN

 

Switch:

 

2109

 

Model

 

M12

 

Installation

 

and

 

Service

 

Guide

Summary of Contents for TotalStorage 2109 M12

Page 1: ...M12 Installation and Service Guide GC26 7633 00 Read Before Using This product contains software that is licensed under written license agreements Your use of such software is subject to the license a...

Page 2: ......

Page 3: ...IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide GC26 7633 00...

Page 4: ...OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE Some states or regions do not allow disclaimer of express or implied warranties i...

Page 5: ...tery notice xxiv Fire suppression systems xxiv Product recycling xxiv Product disposal xxiv About this document xxv Who should read this document xxv Model M12 library xxv Related documents xxv Web si...

Page 6: ...l M12 standard shipment 41 Unpacking the M12 42 Installing an additional M12 in a cabinet 43 Time required 43 Tools required 43 Installing the brackets 43 Using the lift tool the 24 inch load plate an...

Page 7: ...ications 86 Fibre channel port specifications 88 Facility specifications 89 Power specifications 89 Environmental requirements 90 General specifications 90 Regulatory specifications 92 POST and Boot s...

Page 8: ...Glossary 105 Index 119 vi IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 9: ...are not shown 45 24 Placing the clip nuts on the rear rails service aisle side 46 25 Attaching the right and left flat upper mount brackets to the chassis 47 26 Attaching the L shaped upper mount brac...

Page 10: ...viii IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 11: ...0 Sample error messages 82 11 Reference information for the fruinfoset command 82 12 Physical dimensions of the 2109 Model M12 85 13 Component weights 86 14 Memory specifications 86 15 Battery specifi...

Page 12: ...x IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 13: ...G229 9054 publication which is on the CD ROM that accompanies this product See the following examples of danger and caution notices for the location of the ID number Danger notices A danger notice ca...

Page 14: ...ment when there is evidence of fire water or structural damage v Disconnect the attached power cords telecommunications systems networks and modems before you open the device covers unless instructed...

Page 15: ...ly hazardous to people because of some existing condition A caution notice can be accompanied by different symbols as in the examples below If the symbol is It means A hazardous electrical condition w...

Page 16: ...o remove the alternating current ac power 1 Perform a controlled system shutdown 2 Set the power switch on the Model M12 to the off position 3 Disconnect the power cables from the power source DANGER...

Page 17: ...cal problems such as loose components 4 Check any exposed cables and connectors for wear cracks or pinching Safety label checks Perform the following safety label checks 1 Verify that the safety label...

Page 18: ...all SFP transceivers Note The following SFP illustrations may differ from the SFPs included or installed with your particular switch depending upon the SFP manufacturer The labels shown below may vary...

Page 19: ...SJ000317 Figure 6 SFP label front view SJ000314 Figure 7 SFP label back view Safety and environmental notices xvii...

Page 20: ...wrong reading if ground current is present 3 With the power cable connected to the switch verify that there is 0 1 ohm or less resistance between the ground lug on the power cable plug and the metal f...

Page 21: ...11P4369 COM A LINHA ANTES DE MOVER A CHAVE OU O CHASSI DA CHAVE PARA DENTRO OU FORA DO GABINETE ALLINEARE LA PIASTRA DI CARICO P N 11P4369 E LA RIGA PRIMA DI SPOSTARE L INTERRUTTORE O IL TELAIO DELL...

Page 22: ...lt warning label THIS BRIDGE SHOULD BE USED WITH GENIE TOOL P N 09P2481 AND LOAD PLATE P N 11P4369 P N 18P5850 A ESTE BRIDGE DEVE SER UTILIZADO COM A FERRAMENTA GENIE P N 09P2481 E A PLACA DE CARREGAM...

Page 23: ...only SFP or GBIC optical transceivers that comply with the FDA radiation performance standards 21 CFR Subchapter J Internationally use only SFP or GBIC optical transceivers that comply with IEC stand...

Page 24: ...bient temperature for all your rack mounted devices v Do not install a unit in a rack where the air flow is compromised Ensure that air flow is not blocked or reduced on any side front or back of a un...

Page 25: ...rify that the route that you choose can support the weight of the loaded rack cabinet Refer to the documentation that came with your rack cabinet for the weight of a loaded rack cabinet Verify that al...

Page 26: ...cal building inspector or both should be consulted in selecting a fire suppression system that provides the correct level of coverage and protection IBM designs and manufactures equipment to internal...

Page 27: ...Installation and Service Guide GC26 7633 this document v IBM TotalStorage SAN Switch 2109 Model M12 and Model M14 User s Guide GC26 7636 v IBM eServer Safety Notices G229 9054 v IBM TotalStorage SAN S...

Page 28: ...e http www ibm com servers storage support san To get specific details about models and firmware that the switch supports see the following Web site http www storage ibm com ibmsan For detailed inform...

Page 29: ...e and high quality information If you have comments or suggestions for improving this document you can send us comments electronically by using the following addresses v Internet starpubs us ibm com v...

Page 30: ...xxviii IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 31: ...of the Fabric OS The optional Advanced Security feature has the following capabilities v Centralized security management v Fabric wide security policies to control access v Port and switch level acces...

Page 32: ...mance of network storage resources v ISL Trunking Connects up to four ISLs between two switches through an expansion port E_port to merge logically into one link v Fabric Watch Monitors mission critic...

Page 33: ...ide light emitting diodes LEDs for monitoring the switch from the blower assembly side and store WWN and IP address information switch name and serial number v Three blower assemblies Each blower asse...

Page 34: ...aaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaa...

Page 35: ...v SNMP applications v Management server For more information about these management interfaces see the Brocade Fabric Manager User s Guide and the Brocade Advanced Web Tools User s Guide Chapter 1 Int...

Page 36: ...6 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 37: ...time you power on A POST takes a minimum of 3 minutes A POST is complete when light emitting diode LED activity returns to a standard state For information about LED light patterns see Interpreting LE...

Page 38: ...l switches You can modify it by using the ipAddrSet command Note If you reset a logical IP address while the switch has active IP traffic you can cause the IP traffic to be interrupted or stopped IP t...

Page 39: ...a terminal emulator application such as a HyperTerminal in a Microsoft Windows 95 Windows 2000 or Windows NT environment or TERM in a UNIX environment a Disable any serial communication programs that...

Page 40: ...it to the CP card in slot 6 and login as admin b At the prompt type ipAddrSet 2 for the CP card in slot 5 or type ipAddrSet 3 for the active CP card in slot 6 c Type the requested information at the...

Page 41: ...the switch remotely by using any of the available management tools such as Telnet or Web Tools Be sure that the switch is not modified from other connections during the rest of this procedure 7 Optio...

Page 42: ...0 at the prompt for that condition 11 Add SFPs and cables to the Fibre Channel ports as required Note The ports are color coded to indicate which ones can be used in the same trunking groups Four por...

Page 43: ...ed information about the switch 13 Check the fabric for ISLs switch names or other status Type the following command at the Telnet prompt fabricShow This command provides general information about the...

Page 44: ...14 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 45: ...rce Note Removing all power from the switch triggers a system reset When you restore the power all devices return to the initial state and the switch runs a POST Attention After you power on the switc...

Page 46: ...determine the status of a 16 port card 1 Check the LEDs on the 16 port card See Table 3 on page 22 for information about how to interpret the LEDs 2 Check the 16 port card status by using the slotSho...

Page 47: ...To ensure correct air circulation inside the switch and protection from dust you can order filler panels for any empty slots The active CP card controls the following services v System initialization...

Page 48: ...input connectors each with a green ac power switch circuit breaker The left power input connector provides power to the power supplies in slot 1 and slot 3 The right power input connector provides po...

Page 49: ...s a filler panel the corresponding LEDs on the WWN card are not illuminated Note There are two types of WWN cards One type is attached to the chassis by screws and the other type is held on by the pre...

Page 50: ...shing light green amber or yellow The LEDs can flash green yellow or amber while the switch is starting or while a POST or other diagnostic tests are running This is normal It does not indicate a prob...

Page 51: ...ED 16x Port Speed LED 16x Power LED Direction to Push Yellow Ejector Button Direction to Push Yellow Ejector Button Status LED Ejector 2x Port 16x SJ000637 Figure 14 16 port card LEDs Chapter 3 Operat...

Page 52: ...D is lit Steady yellow The 16 port card is faulty Ensure that the card is firmly seated and check the status with the slotShow command If the LED still displays yellow contact IBM Slow flashing yellow...

Page 53: ...line but segmented indicating a loopback plug or cable or an incompatible switch Verify that the correct device is connected to the port Fast flashing green on 1 4 second off 1 4 second The port is in...

Page 54: ...agnostic tests Figure 15 shows the location of the LEDs on the CP card Link Speed LED 10 100 Mb s Link Status LED CP Card Power LED Direction to Push Yellow Ejector Button Direction to Push Yellow Eje...

Page 55: ...s not seated correctly or is faulty Pull the CP card out and reseat it If the LED continues to flash replace the CP card Fast flashing yellow on 1 2 second off 1 2 second The environmental range is ex...

Page 56: ...gnostic tests Figure 16 shows the location of the LEDs on the power supply Table 5 on page 27 describes the power supply LED patterns It lists the name location and possible colors of each LED It also...

Page 57: ...not have incoming power Check the Power LED Flashing amber The power supply is about to fail because there is a failing fan inside the power supply Replace the power supply Fail Below the Predictive...

Page 58: ...aaaaaaaaaa aaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaa...

Page 59: ...then reseat unit If the LED continues to flash replace the unit LEDs on the WWN card and bezel The WWN card and bezel are located at the top of the chassis on the blower assembly side The bezel covers...

Page 60: ...s on a number of functions including v Internal connections and circuitry v Port function v Ability to send and receive frames v All aspects of memory parity and statistics counters v Correct serializ...

Page 61: ...or through a terminal that is set up for a serial connection to the switch Some tests require that external cables connect the ports to each other This allows diagnostics to verify the serializer or d...

Page 62: ...32 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 63: ...if a failover occurs If both CP cards connect to a shared telephone line callers automatically dial into the active CP card The active CP card answers on the first ring If the active CP card cannot an...

Page 64: ...terminal emulator application such as HyperTerminal on Windows 95 98 2000 ME or NT or TERM in a UNIX environment 2 Disable any serial communication programs that are running on the workstation such as...

Page 65: ...to the fabric You need the following items to set up two modems to work with the switch v Two Hayes compatible modems such as the Zoom Modem V 92 EXT Model 3049 v Two standard modem cables DB25 male...

Page 66: ...onal on page 34 dial in to the customer telephone number for the switch 7 Observe the modem LEDs The ring indicator RI LED should flash briefly as the telephone rings If the RI LED does not flash on b...

Page 67: ...er evaluate the attached modems It is important to wait approximately 5 minutes after a failover or restart to allow the system to correctly set up the modems 2 For security reasons the modem session...

Page 68: ...38 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 69: ...s Attention To ensure adequate cooling install the chassis with the port side facing the aisle where exhaust air is released usually called the service aisle This prevents the fans from pulling in hea...

Page 70: ...ent M12 The bridge tool when installed serves as a temporary ramp between the lift tool and the M12 rails that are installed in a Model C36 cabinet You do not need to return the bridge tool when you a...

Page 71: ...paperwork and components are packed and restored in the arbocrate shipping container of the lift tool Ensure that the lift tool is functioning properly before you release the tool to UPS Logistics for...

Page 72: ...to hold the kits in place during transportation to the installation area d Do not move the chassis off the pallet until the door is removed 2 Open the shipping crate by pulling the handle of the latc...

Page 73: ...cabinet This section describes how to install the M12 in the Model C36 cabinet These procedures use parts that are included in the 14U chassis mount kit Time required Allow approximately 2 5 hours to...

Page 74: ...of EIA unit 22 the middle of EIA unit 23 and the bottom of EIA unit 23 for the front of the cabinet c You can route the cables down through the cable management tray or through the holes in the sides...

Page 75: ...n M12 into the top of the rack go to step 4b for the location of the clip a Attach the lower clip nuts to the top of EIA unit 6 Attach the upper clip nuts to the middle of EIA unit 17 b Attach the low...

Page 76: ...3a and 4a to the chassis by using four of the 10 32 x 5 16 in Phillips flathead screws item 5 per bracket Tighten the screws Orient the slotted holes in the brackets towards the blower side of the ch...

Page 77: ...or the location of the bracket If you are installing an M12 into the top of the rack go to step 7b on page 48 for the location of the bracket SJ000665 Flat Upper Rack Mount Bracket 2x Items 3a and 4a...

Page 78: ...all it C011 Attention Before you install it verify that the additional weight of the chassis does not exceed the cabinet s weight limits or unbalance the cabinet When you calculate the additional weig...

Page 79: ...the anti tip bracket d Secure the anti tip bars by using the anti tip bracket and bolt 10 If you are installing the lower M12 go to step 11 If you are installing the upper M12 go to step 12 on page 50...

Page 80: ...install the bridge tool by completing the following steps a Remove the bridge tool from the box and adjust the two supports 45 b Hold the bridge tool between the two vertical supports near EIA unit 20...

Page 81: ...ower assemblies 19 Fasten the two flat left and right upper mount brackets that are on the chassis to the two L shaped upper left and right cabinet mount brackets Use the two screws that were set asid...

Page 82: ...racted Push the levers into the notches b Align the door hinges with the chassis portion of the hinges c Release the pins by pushing the levers out of the notches SJ000668 10 32 Screws 4x Item 6 Servi...

Page 83: ...instructions are included with the lift tool 2 Remove both power cords from the M12 3 Remove the power supplies and blower assemblies to reduce the weight 4 Remove the chassis door from the chassis a...

Page 84: ...rtical supports near EIA unit 20 c Move the two supports another 45 Make sure that the following conditions are met v The two pin section of the support is on the back of the vertical support v The on...

Page 85: ...calculate the additional weight include the cards or power supplies that partially extend out of the chassis P N 18P5850 B SJ000752 CAUTION A pinch point exists between the load plate and the bridge t...

Page 86: ...56 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 87: ...following safety notices apply to all the procedures in this chapter Review this section carefully before you perform any power related operations DANGER An electrical outlet that is not correctly wir...

Page 88: ...overs unless instructed otherwise in the installation and configuration procedures v Connect and disconnect cables as described below when installing moving or opening covers on this product or attach...

Page 89: ...les that are connected to that 16 port card must be disconnected You can notify the switch of a hot swap request in two ways You can either run the slotPowerOff and slotPowerOn commands or click the e...

Page 90: ...he hot swap request before you uninstall the port card 5 Lever both ejectors open to approximately 45 and pull the port card out of the chassis Note If you inadvertently re latch the ejectors before y...

Page 91: ...ab in on each ejector See Figure 33 2 Lever both ejectors all the way open 3 Slide the filler panel out of the chassis See Figure 34 on page 62 Note Filler panels without ejectors are equipped with a...

Page 92: ...port card or filler panel inside the upper rail guides and the lower rail guides in the slot See Figure 35 on page 63 Slide the 16 port card or filler panel into the slot with slight pressure to the l...

Page 93: ...aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaa...

Page 94: ...nd regulatory certifications No user serviceable parts are inside a CP card or filler panel To ensure correct cooling of the chassis and protection from dust install a filler panel in any slots that d...

Page 95: ...messages for the CP master For more information about diagnostic and error messages see the Brocade Diagnostic and System Error Message Reference and the Brocade Fabric OS Procedures Guide Recording...

Page 96: ...es that failover is complete e Run the hashow command from the serial console for the healthy CP card to verify the failover See the following example for possible output Fabric OS cp1 cp1 Console Log...

Page 97: ...onfig txt config txt Password xxxxxx upload complete SW1 admin Removing a CP card or filler panel Attention Wear an ESD grounding strap when handling a CP card The chassis has a grounding connection a...

Page 98: ...uninstall the card c Lever both ejectors all the way open and slide the CP card out of the chassis Perform the following steps to remove a filler panel 1 Push in the yellow tab on each ejector See Fig...

Page 99: ...sily ensure that it is correctly oriented and aligned in the rail guides before you continue Figure 38 on page 70 shows the alignment guides in the card slots SJ000643 Direction to Push Yellow Ejector...

Page 100: ...aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaa...

Page 101: ...D 8 SW BLADE 2 ENABLED 9 SW BLADE 2 ENABLED 10 SW BLADE 2 ENABLED SW1 admin 3 Determine the firmware version For Fabric OS v4 0 and earlier run the version command For Fabric OS v4 0c and later firmwa...

Page 102: ...plist Password xxxxxx Full Install Otherwise upgrade only Y Do Auto Commit after Reboot Y Reboot system after download N y Start to install packages dir terminfo glibc sin Write kernel image into flas...

Page 103: ...ProbeDisable 0 fabric ops mode isolate 0 fabric ops mode longDistance 0 fabric ops mode noClassF 0 fabric ops mode tachyonCompat 0 fabric ops mode unicastOnly 0 fabric ops mode useCsCtl 0 fabric ops m...

Page 104: ...ovided with the new card Return the old CP card by using your local return policy Replacing the CP card battery Each CP card has a lithium carbon monoflouride coin cell battery that has a 10 year life...

Page 105: ...er supply in slot 1 or slot 3 and one power supply in slot 2 or slot 4 If only two power supplies are installed and they are both installed in slots corresponding to the same power cable unplugging a...

Page 106: ...r panel by pulling it out by the handle RS 232 RS 232 Link 10 100 Mb s Link 10 100 Mb s Slot 1 2 3 4 5 6 7 8 9 10 Exhaust Vent Power Supply 4 Power Supply 3 Power Supply 2 Power Supply 1 AC Power Swit...

Page 107: ...t Perform these additional steps if you are installing a new power supply 1 Verify that the top LED on the power supply displays a steady green light 2 If a green light does not display ensure that bo...

Page 108: ...rmation about how to check the status of the blower assembly by using Telnet see the Brocade Fabric OS Reference 2 Remove the blower assembly from the chassis CAUTION Support the blower assembly from...

Page 109: ...aaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaa aaaaaaaaaaaa...

Page 110: ...s on the underside of the tray into the two slots at the bottom of the ac panel Rotate the front of the tray up until it locks into place 3 Position and tighten the two screws that you previously remo...

Page 111: ...l Support before you replace the WWN card Verifying if the WWN needs replacing Ensure that the current card is firmly seated when you perform troubleshooting steps Any of the following events might in...

Page 112: ...ght indicate WWN card failure For more information about error messages see the Brocade Diagnostics and System Error Message Reference Note WWN unit 1 and unit 2 do not correspond to the WWNs for logi...

Page 113: ...mum field sizes are as follows Field name Maximum number of characters ID 10 characters PN part number 20 characters SN OEM serial number 20 characters RV revision code 4 characters Chassis SN serial...

Page 114: ...84 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 115: ...for use with a 10 Mbps or 100 Mbps Ethernet connection A real time clock RTC with a 10 year battery and 56 bytes of NVRAM v Four power supplies with built in fans The power supplies plug into internal...

Page 116: ...s it into a high speed serial stream The parallel data is expected to be 8B 10B encoded data or equivalent The ports are compatible with optical SWL 780 850 nm and optical LWL 1270 1350 nm SFPs and SF...

Page 117: ...or information call 1 800 426 4333 Have the IBM part number for the battery unit available when you call C003 Terminal serial port specifications Each CP card provides a terminal serial port with a DB...

Page 118: ...t is required in order to detect the modems Customers should connect a Y cable on the telephone line to each modem The active CP card answers on the first ring The standby CP card answers on the seven...

Page 119: ...nute per switch available in the immediate vicinity of the M12 v The power specifications listed in Power specifications v The environmental specifications listed in Environmental requirements on page...

Page 120: ...ation environments Table 19 Environmental requirements Condition Acceptable range during operation Acceptable range during nonoperation Temperature See Note 0 40 C 40 104 F 0 40 C 40 104 F Humidity 20...

Page 121: ...Gbps full duplex Per 16 port card 64 Gbps all 16 ports at 2 Gbps full duplex Port to port latency Less than 2 microseconds with no contention destination port is free Data transmission range v Up to...

Page 122: ...Ireland Italy Luxembourg Netherlands Portugal Spain Sweden United Kingdom 73 23 EEC based on compliance to EN 60950 92 A1 93 A2 93 A3 95 A4 96 A11 97 CB report inclusive of county deviations TUV GS Ge...

Page 123: ...vices that are connected to the M12 POST performs the following steps 1 Runs preliminary POST diagnostics 2 Initializes the operating system 3 Initializes the hardware 4 Runs diagnostic tests on sever...

Page 124: ...94 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 125: ...ber Units per assembly Description 18P5017 4 each Switch blade 16 port 2 GB 18P5032 1 each Chassis door 18P5034 4 each Filler panel switch blade 16 port 2 GB 18P5035 2 each Blade control processor 18P...

Page 126: ...96 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 127: ...r switches Give your system administrator copies of the completed worksheets Planning worksheet Table 22 Planning worksheet Item Description Firmware level Firmware location Server name Username Direc...

Page 128: ...able 23 Port configuration worksheet Port number Device name Device port Cable length Port type Notes Cable number 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 98 IBM TotalStorage SAN Switch 2109 Model M12 I...

Page 129: ...ksheet Table 24 Zone definition worksheet Zone member type switch port WWN Zone member Zone configuration name Comments Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Appendix C Blank pla...

Page 130: ...uration name Connects to Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Port ID P Port...

Page 131: ...onsistent with local law INTERNATIONAL BUSINESS MACHINES CORPORATION PROVIDES THIS PUBLICATION AS IS WITHOUT WARRANTY OF ANY KIND EITHER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WAR...

Page 132: ...se harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interfe...

Page 133: ...romagnetische Vertr glichkeit von Ger ten EMVG vom 18 September 1998 bzw der EMC EG Richtlinie 89 336 Dieses Ger t ist berechtigt in bereinstimmung mit dem Deutschen EMVG das EG Konformit tszeichen CE...

Page 134: ...Taiwan Class A Electronic Emission Statement Japan VCCI Class A ITE Electronic Emission Statement 104 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Page 135: ...an also refer to a list of the read write access of a particular community string See also device connection controls account level switches Switches that have four login accounts into the operating s...

Page 136: ...ith diskette drives hard disk drives and the keyboard BB_credit See buffer to buffer credit beacon When all the port light emitting diodes LEDs on a switch are set to flash from one side of the switch...

Page 137: ...racter alignment within a data stream See also K28 5 command line interface CLI Interface that depends entirely on the use of commands such as through Telnet or simple network management protocol SNMP...

Page 138: ...between 1 239 DRAM See dynamic random access memory DTE port See data terminal equipment DTE port dual fabric Two identical fabrics that allow redundancy in the event that one fabric fails Use a dual...

Page 139: ...switches hosts and devices A fabric is an active intelligent nonshared interconnect scheme for nodes Fabric Access Allows the application to control the fabric directly for functions such as discover...

Page 140: ...onnections at data rates from 265 Mbps up to 4 Gbps Fibre Channel service FS A service that is defined by Fibre Channel standards and exists at a well known address For example the Simple Name Server...

Page 141: ...heartbeat is typically carried over a dedicated network for clustering traffic In cases of a problem for example a software crash on the operational server or a hardware component failure a heartbeat...

Page 142: ...st be kept secret L LAN See local area network latency The period of time required to transmit a frame from the time it is sent until it arrives LED See light emitting diode light emitting diode LED A...

Page 143: ...n modem cable Consists of a DB 9 connector wired as an RS 232 device and can be connected by serial cable to a data communications equipment DCE device A Hayes compatible modem or Hayes emulation is r...

Page 144: ...ggable SFP can be inserted port card A Fibre Channel card that contains optical or copper port interfaces and acts like a switch module See also 16 port card port login PLOGI The port to port login pr...

Page 145: ...tion a process also known as tunneling such as fibre channel over asynchronous transfer mode ATM or fibre channel over Internet protocol IP remote procedure call RPC A facility that a client uses to r...

Page 146: ...e server SNS A switch service that stores names addresses and attributes for up to 15 minutes and provides them as required to other devices in the fabric SNS is defined by Fibre Channel standards and...

Page 147: ...s protocol used in the Internet and in any network that follows the Internet Engineering Task Force IETF standards for Internet protocol transmission word A group of four transmission characters trap...

Page 148: ...sts within the same zone have access permission to others in the zone but are not visible to any outside the zone See also zoning zone alias An alias for a set of port numbers or worldwide names WWNs...

Page 149: ...ting and configuring 7 turning on and off 15 unpacking 42 verifying modem installation 36 24 inch load plate part number 40 24 inch load plate using 48 A about this document how to send your comments...

Page 150: ...ostic tests 31 digital meter xviii dimensions physical 85 director of licensing address 101 disposal product xxiv door chassis removing 42 E edition notice ii electrical safety 57 electronic emission...

Page 151: ...P card or filler panel 64 L label bridge tool alignment xviii check safety xv label continued fusing caution xvi GBIC xv Genie tool and load plate xx heavy load xvi linecord caution xv pinch point xx...

Page 152: ...ecycling xxiv specifications 85 proper grounding xviii providing initial power to the switch 7 R R009 Non IBM Alteration Attachment Survey form xiv reader comment form processing xxvii recommendations...

Page 153: ...continued restarting 30 service 57 specifications facility 89 general 90 memory 86 modem serial port 88 power 89 regulatory 92 terminal serial port 87 turning on and off 15 worksheets planning 97 por...

Page 154: ...zone configuration 100 zone definition 99 World trade ordering procedure for the lift tool and the 24 inch load plate 40 WWN card and bezel 19 and bezel LEDs 29 restarting the switch 19 Z zone config...

Page 155: ...this book is Very Satisfied Satisfied Neutral Dissatisfied Very Dissatisfied Accurate h h h h h Complete h h h h h Easy to find h h h h h Easy to understand h h h h h Well organized h h h h h Applicab...

Page 156: ...Development Department GZW 9000 South Rita Road Tucson AZ 85744 0001 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Page 157: ......

Page 158: ...Part Number 17P7363 Printed in USA GC26 7633 00 1P P N 17P7363...

Page 159: ...Spine information IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...

Reviews: