3-14
TS2900 Tape Autoloader Setup, Operator, and Service Guide
prior to using the Web User Interface to access the library. If the Ethernet
connection is directly attached to a server or a PC, a crossover Ethernet cable may
be required.
Method 2
: Plug the Ethernet cable into an Ethernet switch or router to access the
Web User Interface on a LAN (Local Area Network). The library network settings
must first be entered using the Operator Panel prior to using the Web User
Interface to access the library.
Connecting the Power Cord
Important:
This product can ONLY be used with an approved power cord for your
specific geographic region. Use of an unapproved power cord may result
in:
• not meeting individual country specific safety requirements
• overheating with potential personal injury and/or property damage
• a fracture resulting in the internal contacts being exposed, which
potentially could subject the user to a shock hazard
To connect a power cord:
1.
Plug one end of the power cord or rack PDU line cord into the power connector
( in Figure 3-15) on the rear panel of the library.
Note:
On rack mount installations, run the rack PDU line cord through the hook and
loop fastener strap on the right rear bracket, and tighten the strap. The rack
PDU line cord is a special power cord that plugs into a rack power strip.
2.
Plug the other end of the power cord into the nearest properly grounded power
outlet. On rack mount installations, plug the other end of the rack PDU line cord
into the nearest rack PDU.
3.
Power ON the library by toggling the power switch on the power supply to the
ON (|) position.
4.
Wait for the library to initialize.
Note:
If the Operator Panel does not initialize, check all cable connections, and
ensure that the cartridge magazine is closed and in the locked position, and
that the power supply switch is in the ON position. If the Operator Panel still
does not initialize, see Chapter 6, “Troubleshooting,” on page 6-1.
Important:
To disconnect all power from the library, turn the power switch to the
OFF position, then remove the power cord from the outlet. The power
switch removes power from portions of the library and the drive, but the
power supply still has ac power at its input.
Note:
When power cycling the library, wait 10 seconds after the power is OFF before
powering ON again.
Configuring the Library
The library can be configured using the Web User Interface and/or the Operator
Panel. The recommended method for configuring your library is using the Web User
Interface. See “Configuring Your Library using the Operator Panel” on page 3-28 and
“Configuring Your Library using the Web User Interface” on page 3-16.
3
Summary of Contents for System Storage TS2900
Page 2: ......
Page 10: ...viii TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 14: ...xii TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 22: ...xx TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 24: ...xxii TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 36: ...1 12 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 78: ...3 34 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 114: ...4 36 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 136: ...5 22 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 192: ...A 22 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 220: ...D 10 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 230: ...F 4 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 232: ...G 2 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 238: ...H 6 TS2900 Tape Autoloader Setup Operator and Service Guide...
Page 255: ......
Page 256: ...Part Number 45E3877 Printed in USA GC27 2212 00 1P P N 45E3877...