Each canister has two SAS ports that are numbered 1 on the left
1
and 2 on the
right
2
.
Port 1 is the input port, as indicated by the arrow at
1
. Port 1 must always be
connected.
Port 2 is the output port, as indicated by the arrow at
2
. Port 2 is only connected
if this expansion unit is not the last one in the chain.
Note:
The reference to the left and right locations applies to canister 1, which is
the upper canister. The port locations are inverted for canister 2, which is the lower
canister.
svc00668
1
1
2
2
Figure 3. SAS ports and LEDs in rear of expansion enclosure
Chapter 3. Before you begin the installation
7
Summary of Contents for Storwize V7000
Page 20: ...2 IBM Storwize V7000 Expansion Enclosure Installation Guide...
Page 26: ...8 IBM Storwize V7000 Expansion Enclosure Installation Guide...
Page 36: ...18 IBM Storwize V7000 Expansion Enclosure Installation Guide...
Page 38: ...20 IBM Storwize V7000 Expansion Enclosure Installation Guide...
Page 42: ...24 IBM Storwize V7000 Expansion Enclosure Installation Guide...
Page 43: ......
Page 44: ...Part Number 00AR336 Printed in USA GC27 4234 02 1P P N 00AR336...