Note:
The fibre cables are connected in pairs. Both canisters must have the same
number of cables connected.
Procedure
To install the cables, complete the following steps.
1.
Identify the correct pair of fibre cables for the Ethernet ports that are labeled 3
in the left canister and the right canister.
2.
Connect the appropriate cable to each port.
3.
For each additional pair of Ethernet ports in the right and left canisters,
identify the correct pair of cables and connect them.
Results
Figure 18 shows an example configuration. The figure shows a pair of cables that
are connected to port 3 in each canister. Another pair of cables is connected to port
4 in each canister.
1
2
3
4
6
1
2
1
2
OK
IN
1
2
3
4
6
1
2
1
2
OK
IN
v3500102
1
2
LNK
TxRx
1
2
LNK
TxRx
Figure 18. Example configuration with two pairs of cables connected to 10 Gbps iSCSI-FCoE
2-port host interface adapters
Chapter 2. Installing the hardware
23
Summary of Contents for Storwize V5000
Page 1: ...IBM Storwize V5000 Quick Installation Guide GI13 2861 05 IBM...
Page 4: ...iv Storwize V5000 Quick Installation Guide...
Page 6: ...vi Storwize V5000 Quick Installation Guide...
Page 8: ...viii Storwize V5000 Quick Installation Guide...
Page 24: ...xxiv Storwize V5000 Quick Installation Guide...
Page 64: ...40 Storwize V5000 Quick Installation Guide...
Page 66: ...42 Storwize V5000 Quick Installation Guide...
Page 68: ...44 Storwize V5000 Quick Installation Guide...
Page 79: ......