heads.
Removing the chassis door and cable management comb
The chassis door must be removed before the chassis can be installed into the
cabinet. The door is not hinged. It is held to the chassis by mounting hardware on
the door that snaps onto eight ball studs on the chassis. To remove the door, grip
both sides of the door, and gently pull the door straight out until it releases from
the ball studs on the chassis.
Set the door aside for later reinstallation.
Note:
Reinstall the chassis door once the chassis is installed and all cabling and
configuration is complete. The chassis door must be installed to ensure the
SAN768B-2 meets EMI and other regulatory certifications.
1/2"
5/8"
1U
5/8"
5/8"
5/8"
E
E
A
B
Top screws in shelf bracket
Hole 1
Bottom screws in shelf bracket
Shown with clip nuts for round hole rails
with Square Holes
Setup for rails
Retainer Nut
(Item F)
Rail
Rail
Attaching clip nuts
b768ig029
Figure 5. Installing clip or retainer nuts on the vertical cabinet rails
Chapter 2. Installing a SAN768B-2 in a cabinet
21
Summary of Contents for SAN768B-2
Page 2: ......
Page 8: ...vi SAN768B 2 Installation Service and User Guide...
Page 10: ...viii SAN768B 2 Installation Service and User Guide...
Page 14: ...xii SAN768B 2 Installation Service and User Guide...
Page 28: ...xxvi SAN768B 2 Installation Service and User Guide...
Page 40: ...12 SAN768B 2 Installation Service and User Guide...
Page 108: ...80 SAN768B 2 Installation Service and User Guide...
Page 182: ...154 SAN768B 2 Installation Service and User Guide...
Page 186: ...158 SAN768B 2 Installation Service and User Guide...
Page 196: ...168 SAN768B 2 Installation Service and User Guide...
Page 202: ...174 SAN768B 2 Installation Service and User Guide...
Page 220: ...192 SAN768B 2 Installation Service and User Guide...
Page 226: ...198 SAN768B 2 Installation Service and User Guide...
Page 227: ......
Page 228: ...Part Number 00MA746 Printed in USA GA32 0893 06 1P P N 00MA746...