Keep the shipping container for use when moving or shipping the chassis in the
future. The shipping carton can be flattened and stored with the pallet.
Note:
The switch is thoroughly inspected before shipment. If any damage occurred
during transportation or any items are missing, contact your customer service
representative immediately.
To inspect the shipment, complete the following steps.
1.
Compare the shipment to the equipment list provided by your customer service
representative and ensure that you have received all items, including the
following:
v
Grounding lug kit
v
Mounting kit
v
ESD wrist strap
v
Cables and connectors
v
Any optional items ordered.
2.
Check for damage and report any discrepancies or damage to your customer
service representative. Have the following information ready when you contact
your customer service representative.
v
Invoice number of shipper (see packing slip)
v
Model and serial number of the damaged unit
v
Description of damage
v
Effect of damage on the installation
Site requirements
Before installing the device, be sure the following facilities requirements are met.
Table 3. Facility requirements
Type
Requirements
Electrical
v
Adequate supply circuit, line fusing, and wire size, as specified
by the electrical rating on the switch nameplate
v
Circuit protected by a circuit breaker and grounded in
accordance with local electrical codes
Refer to the Technical Specifications at the end of this guide for
complete power supply specifications.
Thermal
v
A minimum airflow of 79.8 cubic meters/hour (47 cubic ft/min.)
available in the immediate vicinity of the switch
Note:
Although this airflow may exceed the airflow maximum
listed in the device Technical Specifications, the additional
airflow is recommended to pressurize the inlet (cool isle) side of
rack installations relative to the exhaust side to minimize
recirculation of hot air back to the inlet side.
v
Ambient air temperature not exceeding 40°C (104°F) while the
switch is operating
Rack (when
rack-mounted)
v
Two rack units (2U) in a 48.3 cm (19-inch) rack
v
All equipment in the rack grounded through a reliable branch
circuit connection
v
Additional weight of switch not to exceed the rack’s weight
limits
v
Rack secured to ensure stability in case of unexpected movement
14
SAN50C-R Installation, Service, and User Guide
Summary of Contents for SAN50C-R
Page 1: ...IBM Storage Networking SAN50C R Installation Service and User Guide SC27 9274 00 IBM...
Page 2: ......
Page 3: ...IBM Storage Networking SAN50C R Installation Service and User Guide SC27 9274 00 IBM...
Page 8: ...vi SAN50C R Installation Service and User Guide...
Page 10: ...viii SAN50C R Installation Service and User Guide...
Page 24: ...xxii SAN50C R Installation Service and User Guide...
Page 31: ...rav00052 Figure 7 IBM SAN50C R Fan Module Chapter 1 Introducing the SAN50C R 7...
Page 52: ...28 SAN50C R Installation Service and User Guide...
Page 60: ...36 SAN50C R Installation Service and User Guide...
Page 72: ...48 SAN50C R Installation Service and User Guide...
Page 74: ...50 SAN50C R Installation Service and User Guide...
Page 84: ...60 SAN50C R Installation Service and User Guide...
Page 85: ......