Removing and installing port, application, and encryption blades
This section describes how to remove and install port, application, and encryption
blades.
Attention:
A blade should be removed only when being replaced with another
blade or a filler panel. Any slot that is not occupied by a blade should be occupied
by a filler panel to ensure correct cooling of the chassis and protection from dust.
Slots are numbered from 1 through 8, from bottom to top when facing the port
side of the SAN384B-2. Port , application, and encryption blades can be installed in
slots 1–2 and 7–8.
Attention:
Follow ESD precautions (see “ESD precautions” on page xxi) for
removal or replacement of any blades.
Time and items required
The replacement procedure for each blade takes 5 to 25 minutes, depending on the
number of ports, transceivers, and cables involved. The following items are
required for the blade and filler panel replacement:
v
ESD (electrostatic discharge) grounding strap
v
Workstation computer
v
Replacement blade or filler panel
v
#2 Phillips screwdriver
v
Small form-factor pluggable SFP+, or mSFP transceivers (as needed)
v
Optical and copper cables (as needed)
Removing a port or application blade
Attention:
If multiple blades are being replaced, replace one blade at a time.
Attention:
Follow ESD precautions (see “ESD precautions” on page xxi) for
removal or replacement of any blade.
Note:
The FC8-64 port blade, the FS8-18 encryption blade, and the FX8-24
application blade are compatible with the SAN384B, SAN384B-2, SAN768B,
and SAN768B-2. The FC8-32E, FC8-48E, FC16-32, and FC16-48 port blades
are compatible only with the SAN384B-2 and SAN768B-2.
Complete the following steps to remove a port blade.
1.
Remove the chassis door. (See “Removing and installing the chassis door” on
page 67.)
2.
Check the power LED, status LED, and port status LEDs to identify any
possible problems. A failed port or application blade can be identified by
inspecting the LEDs on the front panel of each blade. See Figure 19 on page 55
to Figure 25 on page 58 for LED locations.
3.
Establish a Telnet or console session.
Before installing a blade, establish a Telnet or console connection to determine
a failure and verify operation after installation. Use the
slotShow
command to
view the status of blades.
4.
Check for adequate cable slack. Ensure there is plenty of cable slack to remove
a blade without cable obstruction.
70
SAN384B-2 Installation, Service, and User Guide
|
Summary of Contents for SAN384B-2
Page 2: ......
Page 8: ...vi SAN384B 2 Installation Service and User Guide ...
Page 12: ...x SAN384B 2 Installation Service and User Guide ...
Page 14: ...xii SAN384B 2 Installation Service and User Guide ...
Page 16: ...xiv SAN384B 2 Installation Service and User Guide ...
Page 28: ...xxvi SAN384B 2 Installation Service and User Guide ...
Page 32: ...xxx SAN384B 2 Installation Service and User Guide ...
Page 82: ...50 SAN384B 2 Installation Service and User Guide ...
Page 146: ...114 SAN384B 2 Installation Service and User Guide ...
Page 172: ...140 SAN384B 2 Installation Service and User Guide ...
Page 188: ...156 SAN384B 2 Installation Service and User Guide ...
Page 189: ......
Page 190: ... Part Number 98Y2654 Printed in USA GA32 0894 03 1P P N 98Y2654 ...