2.
Reconnect the Fibre Channel and Ethernet cables. Ensure that you replace the Fibre Channel and
Ethernet cables in the same ports from which they were removed.
3.
Replace the cable-retention bracket. See “Replacing the cable-retention bracket” on page 39.
Replacing the SAN Volume Controller 2145-8G4 in a rack
Follow these instructions when you are prompted to replace the SAN Volume Controller 2145-8G4.
Attention:
Do not touch the power control switches on adjacent SAN Volume Controller nodes when
you remove or install SAN Volume Controller nodes in a rack. Touching these switches on adjacent SAN
Volume Controller nodes might cause those devices to turn off and make customer data inaccessible.
Perform the following steps to replace the SAN Volume Controller 2145-8G4 in a rack:
1.
Fully extend the support slides.
2.
Align the node on the slide rails and push the node fully into the rack. Secure the node to the front
mounting flanges with the captive thumbscrews (
1
Figure 38. The captive thumbscrews that secure the node and the shipping brackets
Chapter 2. Removing and replacing parts
59
Summary of Contents for SAN Volume Controller 2145-CG8
Page 1: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 2 0 GC27 2283 00...
Page 2: ......
Page 3: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 2 0 GC27 2283 00...
Page 14: ...xii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 24: ...xxii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 30: ...xxviii IBM SAN Volume Controller Hardware Maintenance Guide...
Page 54: ...24 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 362: ...332 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 364: ...334 IBM SAN Volume Controller Hardware Maintenance Guide...
Page 371: ......
Page 372: ...Part Number 31P1584 Printed in USA GC27 2283 00 1P P N 31P1584...