Table 4. Cable-management arm and associated parts descriptions and quantities
Reference
Description
Quantity
1
Slide rail (left)
1
2
Slide rail (right)
1
3
M6 screws
4
4
Large cable tie
1
5
Cable ties
5
6
Cable-management support arm
1
7
Cable-management arm assembly
1
Notes:
v
With some types of racks, you might find it helpful to remove the rack doors
and side panels to provide easier access during installation.
v
The slide rails are marked (RIGHT / FRONT and LEFT / FRONT) for proper
placement on the rack flanges.
v
The front and back of each rail has a spring-loaded rail-locking carrier, which
can be locked in the open position and then released when the rail is in the rack.
When you are ready to install the support rails, use the customer's
hardware-location chart and the Electronic Industries Alliance (EIA) positions on
the rack to determine where in the rack that the SAN Volume Controller node is to
be installed.
About this task
Perform the following steps to install the support rails:
Procedure
1.
Verify that you have all the items that you need for installing the support rails
and that you have identified the front of each rail, as shown in Figure 20 on
page 26.
1
Slide rail (left)
2
Slide rail (right)
3
M6 screws
Note:
You might find it helpful, with some types of racks, to remove the rack
doors and side panels to provide easier access during installation.
2.
Open the rear-slide-rail hooks, as shown in Figure 21 on page 28.
Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware
27
Summary of Contents for SAN Volume Controller 2145-CG8
Page 6: ...vi SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 8: ...viii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 28: ...xxviii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 34: ...6 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 72: ...44 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 100: ...72 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 102: ...74 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 104: ...76 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 109: ......
Page 110: ...Part Number 31P1669 Printed in USA GC27 3923 02 1P P N 31P1669...