Continue with step 12.
12.
Secure the TIM and heat sink to the processor socket.
a.
Ensure that the heat sink load arms are engaged as shown by (A) in Figure 177.
b.
Tighten the center load screw clockwise by using the supplied hex key as shown by (B) in
Figure 177 until a firm stop is reached. If the heat sink moves noticeably, the load arms are not
engaged. Unscrew the center load screw and repeat this step again.
Figure 176. Installing the heat sink on the gray-colored TIM
Figure 177. Tightening the center load screw on the heat sink
154
Power Systems: Servicing the IBM Power System S822LC (8335-GTB)
Summary of Contents for S822LC
Page 1: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Page 2: ......
Page 3: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Page 16: ...xiv Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 204: ...188 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 242: ...226 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 243: ......
Page 244: ...IBM ...