on the power supply cage, slide the system backplane forward until it clear the tabs. Then, lift the
system backplane completely out of the chassis. See the following figure.
Figure 61. Lifting the system backplane out of the chassis
g) Place the system backplane on an appropriate ESD surface.
28. Set the new system backplane on the ESD surface next to the system backplane you just removed.
29. Transfer the memory modules and fillers to the new system backplane:
a) Unlock a memory module or filler from its connector by simultaneously pushing both of the
locking tabs away from the module in the direction that is shown in the following figure.
The lever action of the tabs pushes the memory module or filler out of the connector. If you find it
difficult to open the tabs with your fingers, you may use the tips of ball point pens or the eraser
ends of pencils to open the tabs. The levers must be opened simultaneously, so that the memory
module lifts straight up.
62 Power Systems: System backplane
Summary of Contents for Power Systems 9223-22S
Page 4: ...iv...
Page 14: ...xiv Power Systems System backplane...
Page 18: ...or or or or 4 Power Systems System backplane...
Page 138: ...124 Power Systems System backplane...
Page 149: ......
Page 150: ...IBM...