![IBM Power Systems 7063-CR1 Service Manual Download Page 50](http://html1.mh-extra.com/html/ibm/power-systems-7063-cr1/power-systems-7063-cr1_service-manual_3330678050.webp)
13.
Place the system backplane on an ESD mat.
Replacing the system backplane in the 7063-CR1
Learn how to replace the system backplane in the IBM 7063-CR1 Hardware Management Console system.
Procedure
1.
Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is
plugged into a ground jack or connected to an unpainted metal surface. If not, do so now.
2.
Remove the replacement system backplane from the static-protective package and place it on an ESD
mat.
The following steps move the system processor module from the old system backplane to the new system
backplane:
3.
Loosen the load arm screw (A) of the system processor heat sink (B) that you are removing with a
#3 Phillips screw driver. The load arm pivots up in the direction that is shown in Figure 34 on page
35.
Figure 33. Lifting out the system backplane
34
Power Systems: Servicing the 7063-CR1 Hardware Management Console system
Summary of Contents for Power Systems 7063-CR1
Page 1: ...Power Systems Servicing the 7063 CR1 Hardware Management Console system IBM ...
Page 2: ......
Page 3: ...Power Systems Servicing the 7063 CR1 Hardware Management Console system IBM ...
Page 16: ...xiv Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Page 76: ...60 Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Page 98: ...82 Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Page 110: ...94 Power Systems Servicing the 7063 CR1 Hardware Management Console system ...
Page 111: ......
Page 112: ...IBM Printed in USA ...