background image

 

ÉÂÔ

  Installation Instructions

10.3 Log Off the MOSS-E

1. On the 3746-9x0 Menu window, click on Function, then click on Exit.

2. On the MOSS-E View window, click on Program.

3. Click on LOG OFF MOSS-E.

4. Close the front and rear doors of the controller expansion.

10.4 Returning the Machine to the Customer

Inform the customer that the NNP backup is installed and operational.

 11.0 Test Procedures

No test required.

 12.0 Field Updating

None.

After Installation (Steps 13-15)

 13.0 Field Updating

None.

 14.0 Publications Update

None.

 15.0 Parts Disposition

3746

PN 42L2445

EC F52322

EC F12701A

EC F70078

FFBM

8 of 10

09 Oct 1998

14 DEC 1998

22 APR 1999

  8

 

Summary of Contents for PN 26L0451

Page 1: ...Network Node Control Point NNP B Type 3 Based on 6275 Feature Code 5423 on IBM 3746 900 Written by C Vallee Checked by C Franoux Approved by A Badino Reviewed by R Lympany 3746 PN 42L2445 EC F52322 EC...

Page 2: ...Installation Instructions 3746 PN 42L2445 EC F52322 EC F12701A EC F70078 FFBM 2 of 10 09 Oct 1998 14 DEC 1998 22 APR 1999 2...

Page 3: ...90 5423 Network Node Processor A type 6275 56U or 6275 83U or 5122 Network Node Processor A type 7585 P02 or 5022 Network Node Processor A type 3172 P90 EC Title F12720 Licensed Internal Code Minimum...

Page 4: ...e time with the customer 2 Check all items listed on the BM s to determine that all parts have been received Refer to chapter 1 in the Network Node Processor Installation and Maintenance Based on 6275...

Page 5: ...ps 1 Installing the 6275 56U or the 6275 83U system unit 2 Loading the code on the NNP B Note These steps are documented in the Network Node Processor Installation and Maintenance Based on 6275 SY33 2...

Page 6: ...nit Model 900 IBM 3746 Nways Multiprotocol Controller Model 950 Safety Information GA33 0400 10 0 Details of Installation 10 1 Installing and Connecting the NNP Note For any unexpected message or erro...

Page 7: ...menu Click on Network Node Processor Man agement 2 Double click on Manage Control Point on NNPs 3 Click on Enable the CP NNP back up 4 Click on Close to exit from the function Note For details refer...

Page 8: ...doors of the controller expansion 10 4 Returning the Machine to the Customer Inform the customer that the NNP backup is installed and operational 11 0 Test Procedures No test required 12 0 Field Updat...

Page 9: ...Areas refer to Hardware and General Service Code Description For Domestic Areas return parts to the customer 16 0 Machine Records Install the new MACHINE HISTORY supplied Report installation and qual...

Page 10: ...Installation Instructions 3746 PN 42L2445 EC F52322 EC F12701A EC F70078 FFBM 10 of 10 09 Oct 1998 14 DEC 1998 22 APR 1999 10...

Reviews: