Placing the rack-mounted system into the operating position
Use this procedure to place the rack-mounted system into the operating position.
When you place the system in the operating position, ensure that the cables at the rear of the system do
not catch or bind as you push the system unit back into the rack.
To place a rack-mounted system in the operating position, complete the following steps:
1.
Ensure that you have the electrostatic discharge (ESD) wrist strap attached. If not, attach it now.
2.
Unlock the blue rail safety latches (A) by lifting them upward.
3.
Push the system unit (B) back into the rack until both system unit release latches lock into position.
4.
Secure the server to the rack by using shipping screws.
5.
If you have not already done so, replace the front cover. For instructions, see “Installing the front
cover” on page 42.
Power cords
Use these procedures to disconnect and connect the power cords on IBM Power Systems servers that
contain the POWER8 processor.
Disconnecting the power cords from the system
Use this procedure to disconnect the power cords from the system.
To disconnect the power cords from the system, complete the following steps:
1.
Open the rear rack door on the system unit that you are servicing.
2.
Identify the system unit that you are servicing in the rack.
P8HAJ654-1
A
B
Figure 45. Placing the system into the operating position
58
PCIe3 x8 SAS RAID internal adapter 6 Gb
Summary of Contents for PCIe3 x8 SAS RAID internal adapter 6 Gb
Page 2: ......
Page 8: ...vi PCIe3 x8 SAS RAID internal adapter 6 Gb ...
Page 18: ...xvi PCIe3 x8 SAS RAID internal adapter 6 Gb ...
Page 36: ...18 PCIe3 x8 SAS RAID internal adapter 6 Gb ...
Page 118: ...100 PCIe3 x8 SAS RAID internal adapter 6 Gb ...
Page 129: ...Notices 111 ...
Page 130: ...IBM Printed in USA ...