Completing the Cabling
1 Before you continue
Make sure all channels are properly terminated.
Note:
If ESCON channels are defined as CVC or
CBY and ESCON Converters are not
attached the channels will fail
Power-On-Reset and go into a Permanent
Standby state. To prevent these errors the
channels can be put in Single Channel
Service until ESCON Converters are
installed.
When the installation of all IBM channel attached
equipment is completed,
1. Install all covers.
6-40
Installing the System
Summary of Contents for Multiprise 3000 S/390
Page 1: ...S 390 Multiprise 3000 Enterprise Server R IBM Installation Manual SY24 6154 03...
Page 2: ......
Page 3: ...S 390 IBM Installation Manual SY24 6154 03...
Page 8: ...vi Installing the System...
Page 14: ...xii Installing the System...
Page 34: ...1 20 Installing the System...
Page 40: ...2 6 Installing the System...
Page 78: ...5 20 Installing the System...
Page 156: ...6 78 Installing the System...
Page 160: ...7 4 Installing the System...
Page 172: ...B 4 Installing the System...
Page 173: ......
Page 175: ...Spine information IBM S 390 Installation Manual...