background image

If the rack is provided with stabilizing devices, install the stabilizers before
mounting or servicing the device in the rack.

When installing the device, do not use a ramp inclined more than 10 degrees.

Manually installing the device is a two person lift process. Before lifting the
chassis, remove components as described in the 

IBM Ethernet Appliance J36S

Hardware Guide

. To prevent injury, keep your back straight and lift with your

legs, not your back.

Do not attempt to lift the chassis by the handles on the power supplies or on the
Common Form-factor Modules (CFMs).

The device should be mounted at the bottom of the rack if it is the only unit in
the rack.

When mounting the device in a partially filled rack, load the rack from the bottom
to the top with the heaviest component at the bottom of the rack.

When removing or installing an electrical component, always place it
component-side up on a flat antistatic surface or in an electrostatic bag.

When you install the device, always make the ground connection first and
disconnect it last.

Wire the DC power supply using the appropriate lugs. When connecting power,
the proper wiring sequence is ground to ground, +RTN to +RTN, then –48 V
to –48 V. When disconnecting power, the proper wiring sequence is –48 V to
–48 V, +RTN to +RTN, then ground to ground. Always connect the ground wire
first and disconnect it last.

Do not work on the system or connect or disconnect cables during electrical
storms.

Before working on equipment that is connected to power lines, remove jewelry,
including rings, necklaces, and watches. Metal objects heat up when connected
to power and ground and can cause serious burns or become welded to the
terminals.

Proper clothing and gloves must be worn while installing this device.

Failure to observe these safety warnings can result in serious physical injury.

Compliance Statements for EMC Requirements

Canada

This Class A digital apparatus complies with Canadian ICES-003. Cet appareil
numérique de la classe A est conforme à la norme NMB-003 du Canada.

European Union

This is a Class A product. In a domestic environment this product may cause radio
interference in which case the user may be required to take adequate measures.

24

Compliance Statements for EMC Requirements

IBM Ethernet Appliance J36S Getting Started Guide

Summary of Contents for J36S

Page 1: ...the Chassis into the Rack 12 Reinstall Components 13 Step 4 Connect the External Devices and IOC Cables 13 Connect to a Network for Out of Band Management 13 Connect a Management Console 14 Connect t...

Page 2: ...Requesting Technical Support 26 Revision History 26 2 IBM Ethernet Appliance J36S Getting Started Guide...

Page 3: ...thernet Appliance J36S is a high performance scalable carrier class security device with multi processor architecture The Ethernet appliance has a capacity of up to 30 gigabits per second Gbps full du...

Page 4: ...Appliance J36S Table 1 Minimum System Configuration for the IBM Ethernet Appliance J36S Minimum Component 1 SFB 1 SPC 1 NPC 1 Routing Engine 2 Power Supply 1 Fan Tray Three types of IOC interface car...

Page 5: ...must be capable of supporting up to 926 lb 421 kg For service personnel to service the device there must be adequate space at the front and back of the device Allow at least 30 in 76 2 cm in front of...

Page 6: ...se the screws provided to secure the rack mount brackets to the sides of the chassis For a two post rack mount the brackets at the mid mount holes as shown in Figure 3 on page 6 For a four post rack m...

Page 7: ...ce depends on whether you use a mechanical lift Install the Device Using a Lift on page 7 Install the Device Without a Mechanical Lift on page 10 Install the Device Using a Lift 1 Ensure the rack is i...

Page 8: ...ing position the device so that the bottom rear edge of the chassis rests on the support shelf you installed earlier as shown in Figure 5 on page 7 4 Install a mounting screw into each of the two alig...

Page 9: ...unting bracket 6 Move the lift away from the rack 7 Visually inspect the alignment of the device If the device is installed properly in the rack all the mounting screws on one side of the rack should...

Page 10: ...net appliance light enough to install manually you first remove most components from the chassis as shown in Figure 9 on page 10 and Figure 10 on page 11 Power supplies Switch Fabric Board SFB Routing...

Page 11: ...nt by loosening its retaining screws and unlatching its ejector handles as appropriate For full instructions on removing device components see the IBM Ethernet Appliance J36S Hardware Guide 3 Slide ea...

Page 12: ...the device so that the bottom rear edge of the chassis rests on the support shelf you installed earlier as shown in Figure 5 on page 7 WARNING Do not attempt to lift the chassis by the handles on the...

Page 13: ...e covered with blank panels before operating the device Step 4 Connect the External Devices and IOC Cables To connect external devices and IOC cables Connect to a Network for Out of Band Management on...

Page 14: ...er light that can damage your eyes CAUTION Do not leave a fiber optic transceiver uncovered except when inserting or removing cable The safety cap keeps the port clean and prevents accidental exposure...

Page 15: ...SD grounding strap to your bare wrist and connect the strap to an approved site ESD grounding point See the instructions for your site 3 Ensure that all grounding surfaces are clean and brought to a b...

Page 16: ...out ESD see the IBM Ethernet Appliance J36S Hardware Guide 2 Locate the power cord or cords you will use to connect the device to AC power See the IBM Ethernet Appliance J36S Hardware Guide for specif...

Page 17: ...AC power supply is installed correctly the PWR LED on the SFB lights steadily If the PWR LED indicates that the power supply is not functioning normally repeat the installation and cabling procedures...

Page 18: ...nal studs on the faceplate b Attach the positive DC source power cable lug to the RTN return terminal Figure 15 Connect DC Power Cables c Secure the cable lug to the terminal on the power supply first...

Page 19: ...o forward traffic For complete information about enabling the device to forward traffic including examples see the appropriate JUNOS Software configuration guides To configure the software 1 Verify th...

Page 20: ...uting options static route 0 0 0 0 0 next hop gateway 13 Configure basic security zones and bind them to traffic interfaces edit admin set security zones security zone trust interfaces ge 0 0 0 admin...

Page 21: ...vreBsJkNR1EF0uurTBkE SECRET DATA services ssh web management http interface ge 0 0 0 0 syslog user any emergency file messages any any authorization info file interactive commands interactive commands...

Page 22: ...nation address any application any then permit 18 Commit the configuration to activate it on the device edit admin commit 19 Optionally configure additional properties by adding the necessary configur...

Page 23: ...vice attach an ESD strap to an ESD point and place the other end of the strap around your bare wrist Failure to use an ESD strap could result in damage to the device CAUTION An external Surge Protecti...

Page 24: ...ire the DC power supply using the appropriate lugs When connecting power the proper wiring sequence is ground to ground RTN to RTN then 48 V to 48 V When disconnecting power the proper wiring sequence...

Page 25: ...tions firewall and security services system alarms and events and network performance This guide also shows how to administer user authentication and access upgrade software and diagnose common proble...

Page 26: ...tial Release Copyright International Business Machines Corporation 2008 2009 All rights reserved Printed in USA US Government Users Restricted Rights Use duplication or disclosure restricted by GSA AD...

Reviews: