Planning for power for EMS node (https://www.ibm.com/support/knowledgecenter/POWER8/
p8had/p8had_rpower_51x.htm)
Determining your power requirements (https://www.ibm.com/support/knowledgecenter/POWER8/
p8had/p8had_power.htm?view=kc)
Server Information Form 3A (https://www.ibm.com/support/knowledgecenter/POWER8/p8had/
p8had_form3a.htm?view=kc)
Workstation Information Form 3B (https://www.ibm.com/support/knowledgecenter/POWER8/p8had/
p8had_form3b.htm?view=kc)
Plugs and receptacles (https://www.ibm.com/support/knowledgecenter/POWER8/p8had/
p8had_plugs.htm?view=kc)
Supported PDU power cords (https://www.ibm.com/support/knowledgecenter/POWER8/p8had/
p8had_pdupowercords.htm?view=kc)
Modification of IBM-provided power cords (https://www.ibm.com/support/knowledgecenter/
POWER8/p8had/p8had_cordmod.htm?view=kc)
Uninterruptible power supply (https://www.ibm.com/support/knowledgecenter/POWER8/p8had/
p8had_ups.htm?view=kc)
Power distribution unit and power cord options for 0551, 0553, 0555, 7014, 7953, and 7965 racks
(https://www.ibm.com/support/knowledgecenter/POWER8/p8had/p8had_specsheetpdu.htm?
view=kc)
Calculating the power load for 7188 or 9188 power distribution units (https://www.ibm.com/
support/knowledgecenter/POWER8/p8had/p8had_pduloadcalculator.htm?view=kc)
Planning for cables (https://www.ibm.com/support/knowledgecenter/POWER8/p8had/
p8had_cables_51x.htm)
EMS node
Cable management
Power cord routing and retention (https://www.ibm.com/support/knowledgecenter/POWER8/p8had/
p8had_cordretention.htm?view=kc)
2U canister
System calculators (https://www.ibm.com/support/knowledgecenter/POWER8/p8had/
p8had_systemcalculators_51x.htm)
Physical installation planning
Before you set up your system environment, you must verify that the prerequisite conditions for the
system are met.
This information applies to the supported hardware components. Answer the following questions before
you start the installation process.
• Does your physical site meet the environment requirements for your system?
• Do you have adequate rack space for your hardware?
The system requires two Electronic Industries Alliance (EIA) units for each ESS 3000.
• Do the power circuits you are planning to use have sufficient capacity and the correct sockets for your
installation?
Chapter 3. Planning for hardware 27
Summary of Contents for ESS 3000
Page 5: ...Glossary 83 Index 91 Index 91 v...
Page 6: ...vi...
Page 10: ...x...
Page 70: ...58 IBM Elastic Storage System 3000 Hardware Planning and Installation Guide...
Page 74: ...62 IBM Elastic Storage System 3000 Hardware Planning and Installation Guide...
Page 82: ...70 IBM Elastic Storage System 3000 Hardware Planning and Installation Guide...
Page 90: ...78 IBM Elastic Storage System 3000 Hardware Planning and Installation Guide...
Page 92: ...80 IBM Elastic Storage System 3000 Hardware Planning and Installation Guide...
Page 102: ...90 IBM Elastic Storage System 3000 Hardware Planning and Installation Guide...
Page 107: ......
Page 108: ...IBM Product Number 5765 DME 5765 DAE SC28 3107 01...