background image

Safety Notices

Attention:

When moving or relocating certain configurations of the system, the Bulk

Power Regulators (BPRs) must be removed from the top of the rack (front and rear) to
ensure product stability. Specifically, removal of the top two BPRs in the front and rear
is required in systems that have fewer than 2 I/O drawers in the rack.

A

danger notice indicates the presence of a hazard that has the potential of causing

death or serious personal injury.

Danger notices appear on the following pages:

v

vii

v

14

A

caution notice indicates the presence of a hazard that has the potential of causing

moderate or minor personal injury.

Caution notices appear on the following pages:

v

viii

v

ix

v

14

v

17

v

20

For a translation of the safety notices contained in this book, see the

System Unit

Safety Information, order number SA23-2652.

Electrical Safety

Observe the following safety instructions any time you are connecting or disconnecting
devices attached to the system.

DANGER

An electrical outlet that is not correctly wired could place hazardous voltage
on metal parts of the system or the devices that attach to the system. It is the
responsibility of the customer to ensure that the outlet is correctly wired and
grounded to prevent an electrical shock.

Use one hand, when possible, to connect or disconnect signal cables to
prevent a possible shock from touching two surfaces with different electrical
potentials.

During an electrical storm, do not connect cables for display stations, printers,
telephones, or station protectors for communications lines.

D06

vii

Summary of Contents for eserver pSeries 690

Page 1: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...

Page 2: ......

Page 3: ...pSeries 690 Installation Guide SA38 0587 02 ERserver IBM...

Page 4: ...ion Development Department H6DS 905 6C006 11501 Burnet Road Austin Texas 78758 3493 To send comments electronically use this commercial internet address aix6kpub austin ibm com Any information that yo...

Page 5: ...ack If Ordered 9 Connecting Internal Power Cords for the Secondary Rack 11 Connecting I O Cables for the Secondary Rack 12 Connecting the Integrated Battery Feature Power for the Secondary Rack 13 Ste...

Page 6: ...Customer 33 Appendix A Communications Statements 35 Federal Communications Commission FCC Statement 35 European Union EU Statement 35 International Electrotechnical Commission IEC Statement 36 United...

Page 7: ...ut IBF 76 I O Subsystem Positions Fully Populated Primary and Secondary Rack Rear View with IBFs 77 Placement of Subsystem 4 in a Two Rack Configuration Rear View with IBF 78 I O Subsystems 1 Through...

Page 8: ...Clearance Through Doorways 100 Preparing for Rack Top Frame Installation for pSeries 690 Reduced Height Option RPQ8A1173 107 Installing the Rack Top Frame 111 Replacing Covers 117 Index 119 vi Eserver...

Page 9: ...v viii v ix v 14 v 17 v 20 For a translation of the safety notices contained in this book see the System Unit Safety Information order number SA23 2652 Electrical Safety Observe the following safety i...

Page 10: ...prevent electrical shock hazard disconnect all power cables from the electrical outlet before relocating the system D01 CAUTION This unit has more than one power supply cord Follow procedures for rem...

Page 11: ...for laser certification numbers and approval information CAUTION All IBM laser modules are designed so that there is never any human access to laser radiation above a class 1 level during normal oper...

Page 12: ...x Eserver pSeries 690 Installation Guide...

Page 13: ...ges or component failures must verify the accuracy of operations performed and data saved or transmitted by the system at or near the time of the outage or failure In addition users must establish pro...

Page 14: ...xii Eserver pSeries 690 Installation Guide...

Page 15: ...r Monospace Identifies examples of specific data values examples of text similar to what you might see displayed examples of portions of program code similar to what you might write as a programmer me...

Page 16: ...cement Reference order number SA38 0538 contains information regarding slot restrictions for adapters that can be used in this system v The Site and Hardware Planning Information order number SA38 050...

Page 17: ...s included in the chapter v Eserver pSeries Roadmap v Documentation Overview Brief description of the printed and softcopy documentation shipped including targeted audience The Eserver pSeries Roadmap...

Page 18: ...s Service Personnel Tasks Marketing and Customer Tasks Using the System Planning Managed by HMC Begin Site and Hardware Planning Information Hardware Management Console Installation and Operations Gui...

Page 19: ...ns Describes planning considerations for partitioned systems including information on dynamic partitioning and Capacity Upgrade on Demand System administrators printed and softcopy Hardware Management...

Page 20: ...nes operating instructions for hardware diagnostic programs with common MAPs and SRNs Service Request Numbers Service personnel printed and softcopy PCI Adapter Placement Reference Outlines system spe...

Page 21: ...o a Hardware Management Console for pSeries HMC 1 2 4 3 5 6 7 8 9 1 Hardware Management Console 5 6 Primary 7040 Model 61R Integrated Battery Feature IBF Optional for the Primary Power Subsystem Redun...

Page 22: ...38 0508 are complete Weight Reduction Certain system configurations may include a primary rack that weighs in excess of 2500 pounds doors removed as shipped from manufacturing Some elevators have a we...

Page 23: ...need them to complete this installation v A floor plan showing where to place each rack v The items necessary for installing a modem including the correct telephone jack power cords cables and a powe...

Page 24: ...3 Rotate each leveling foot downward until it contacts the surface on which the rack is placed 4 Adjust the leveling feet downward as needed until the rack is level When the rack is level tighten the...

Page 25: ...EMC trim 4 Place top vertical foam on top of the bottom foam 5 Place the top EMC trim part number 11P1105 on top of the secondary rack using the middle two screws Do not tighten the screws yet 6 Plac...

Page 26: ...e Cover 2 EMC Top Trim P N 11P1105 9 Primary Side Cover 3 Bolt and Washer Qty 4 each 10 Rear Vertical Trim P N 11P095 4 Threaded Standoff Qty 4 each 11 EMC Bottom Trim P N 11P2872 5 Front Vertical Tri...

Page 27: ...cords from the primary rack to the secondary rack and connect them to the drawers in the secondary rack See Appendix H Cabling Information on page 87 for additional information To Back To Primary Rac...

Page 28: ...rack to the secondary rack and connect them to the drawers in the secondary rack Secondary Rack Rear To Primary Rack Primary Rack Rear Ports 0 and 1 Ports 0 and 1 Note For more information about cabl...

Page 29: ...ture Power for the Secondary Rack If you are installing an IBF for the secondary rack route the cables as shown in the following illustration IBF P1 IBF P1 Secondary Rack Front Secondary Rack Rear Cha...

Page 30: ...ly cord Follow procedures for removal of power from the system when directed CAUTION Energy hazard remove all jewelry before servicing Step 7 Check the Cables and Connect I O Devices Cables may loosen...

Page 31: ...nit emergency power off UEPO switch is located on the front of the primary frame A Frame of each pSeries 690 When the switch is tripped utility power is confined to the machine power compartment All v...

Page 32: ...tion possible the room EPO cable must be installed for the machine to power on In the following figure an AMP connector 770019 1 is needed to connect to the system UEPO panel For room EPO cables using...

Page 33: ...le case or faceplate is painted be sure the probe tip penetrates the paint and makes good electrical contact with the metal __ 4 Check the resistance from the ground pin of the receptacle to the recep...

Page 34: ...For 200 240 V the acceptable phase phase voltage measurement range is 180 254 V v For 380 415 V the acceptable phase phase voltage measurement range is 342 440 V v For 480 V the acceptable phase phas...

Page 35: ...tion brackets are installed 07H6763 Filler Plate wide 4 Use in the base of the frame to cover openings Install in the base of the frame after all of the cable retention brackets are installed 31L7174...

Page 36: ...tion the HMC and monitor at or near their desired location using the following guidelines v Use caution when lifting or moving the HMC v Use caution when lifting or moving the monitor v Leave enough s...

Page 37: ...tor 3 Attach the power cord to the monitor item 1 in the following illustration If the HMC has a voltage switch ensure that it is in the correct position for the supply voltage Attention Do not plug t...

Page 38: ...f the HMC and the HMC connectors located on the primary I O book 1 Primary Rack 4 Primary HMC Connected to serial port HMC1 in Primary I O Book 2 Primary I O Book 5 Optional Second HMC Connected to Se...

Page 39: ...C modem do the following 1 Connect the modem cable to the external HMC modem 1 2 Connect the other end of the modem cable to serial port 2 3 Connect the phone cable line port of the external modem 2 4...

Page 40: ...able is recommended because each active partition reports errors to the HMC s Service Focal Point application through the LAN network The HMC must be attached to the system s LAN and each partition sh...

Page 41: ...pin is longer than the bottom pin The door is made of aluminum for weight reasons Install the Front Door To install the front door do the following refer to illustration on page 26 Note After install...

Page 42: ...on the left side of the door 1 1 1 1 2 2 2 3 4 2 1 Hinge Pin Typical Front and Rear Door 3 Front Door 2 Rack Hinge Typical Front and Rear Door 4 Rear Door Proceed to Verifying the Hardware Operation...

Page 43: ...port on the pSeries 690 v This procedure runs the AIX online diagnostics in service mode on a system booted in Full System Partition mode Does the system have AIX diagnostics preinstalled YES Go to Lo...

Page 44: ...his is the traditional single system method of using your system s resources The physical operator panel on your managed system displays progress codes when you boot the system to this mode Power On O...

Page 45: ...k for OK in the primary operator panel display which indicates that the system is in standby mode Note If the power has recently been connected to the system you might need to allow approximately five...

Page 46: ...le to load the diagnostics to the point when the DIAGNOSTIC OPERATING INSTRUCTIONS display go to Loading the Standalone Diagnostics from CD ROM Go to Running System Verification on page 31 Loading the...

Page 47: ...e the Initialize Terminal option on the Function Selection menu to initialize the operating system before you can continue with the diagnostics 3 Select the System Verification option on the Diagnosti...

Page 48: ...erver passed all the diagnostic tests the verification process is complete and your server is ready to use If you received an error code record the code and go to the Eserver pSeries 690 Service Guide...

Page 49: ...ring the operating system Refer to the IBM Hardware Management Console for pSeries Installation and Operations Guide to Configure the Network To configure the network the following tasks must be perfo...

Page 50: ...34 Eserver pSeries 690 Installation Guide...

Page 51: ...quipment Unauthorized changes or modifications could void the user s authority to operate the equipment This device complies with Part 15 of the FCC Rules Operation is subject to the following two con...

Page 52: ...turer s adapters it is essential that other optional cards not supplied by the manufacturer do not use main voltages or any other excessive voltages Seek advice from a competent engineer before instal...

Page 53: ...rmit tserkl rung ist die IBM Germany Dieses Ger t erf llt die Bedingungen der EN 55022 Klasse A F r diese von Ger ten gilt folgende Bestimmung nach dem EMVG Ger te d rfen an Orten f r die sie nicht au...

Page 54: ...38 Eserver pSeries 690 Installation Guide...

Page 55: ...cycling facilities may not be available in your area In the United States IBM has established a collection process for reuse recycling or proper disposal of used sealed lead acid nickel cadmium and ni...

Page 56: ...e Doors 7 9 7 9 62 62 Notes 1 Noise levels cited are for the typical configuration A Frame Bulk Power CEC cage battery option media drawer and two I O drawers 2 The 0 6 B 6 dB reduction in noise emiss...

Page 57: ...untry where such provisions are inconsistent with local law THIS MANUAL IS PROVIDED AS IS WITHOUT WARRANTY OF ANY KIND EITHER EXPRESSED OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES O...

Page 58: ...42 Eserver pSeries 690 Installation Guide...

Page 59: ...d floor 11 3 4 inches to 16 inches high Positioning the Rack Note The customer should unpack the rack and position it in the room If this has not been done consult the customer and the marketing repre...

Page 60: ...N6344 4 Bushing Item 5 in illustration on page 49 21L4309 4 Washer Item 3 in illustration on page 49 0130985 4 Washer Item 6 in illustration on page 49 05N6346 4 Bolt 11P4757 Frame Tie down Kit Short...

Page 61: ...ck Components To mount the internal rack components do the following Attention This procedure is performed by the service representative 1 Using four M 8 20 mm screws item 1 in illustration on page 46...

Page 62: ...e rack 10 Install the latch bolts item 7 in illustration on page 46 Rack 2 5 9 10 5 9 10 5 9 10 5 9 10 2 3 3 8 6 6 7 8 1 1 1 1 Screw hex flange 20 mm long 7 Latch Bolt 2 Shipping bar upper 8 Latch Pla...

Page 63: ...raised floor proceed to Attaching the Rack to a Short Raised or Long Raised Floor on page 52 v If the rack is not being attached to the floor proceed to Step 3 Position and Level the PrimaryRack on pa...

Page 64: ...anchoring of the mounting plates A minimum of three anchor bolts for each mounting plate must be used to secure the plates to the concrete floor Because some of the drilled holes may be aligned with c...

Page 65: ...on page 49 front and rear in the approximate mounting position under the system rack 3 To align the mounting plates to the system rack do the following a Place the four rack mounting bolts item 6 in i...

Page 66: ...m REF 32x 21 mm REF 4x x 13 UNC REF 2X 53 7 mm REF 1019 mm 1070 mm REF 4x Caster 2x Mounting Plate 79 65 mm 120 8 mm 5 Remove the mounting bolts from the threaded holes 6 Move the rack away from the m...

Page 67: ...f the washer is facing inward toward the system rack 3 Place the isolator bushing item 4 in illustration on page 49 inside the leveling foot with a washer between the isolator bushing and the floor pl...

Page 68: ...bolts do the following 1 Obtain the service of a qualified structural engineer to determine the appropriate installation of the eyebolts 2 Consider the following before installing the eyebolts v Floor...

Page 69: ...REF 1019 mm 64 6 mm 64 6 mm 100 5 mm 24 Inch Floor Tile Layout 4 Opening for Cables 24 in REF 96 in REF 4X Opening for Cables 654 8 mm 8 49 3 mm Eyebolt 654 8 mm 600 mm 23 6 Inch Floor Tile Layout 60...

Page 70: ...enings in the floor panel and location of the rubber bushing holes so that they match the dimensions given in the following illustrations 654 8 mm 654 8 mm 4x 450 mm REF 8 x 49 3 mm Eyebolts 4X 75 mm...

Page 71: ...disconnected and are not dangling around the frame The frame should be free to roll 3 The floor eyebolts should be already secured to the concrete floor Verify the height of the center of the floor ey...

Page 72: ...used for a 9 1 2 inches to 11 3 4 inches raised floor The Long Turnbuckle Assembly part number 11P4756 is used for an 11 3 4 inches to 16 inches raised floor 6 Place the spacer inside the floor eyebo...

Page 73: ...ng feet by tightening the lock nut 13 Insert the threaded rod into the inner hole of the leveler and the rubber bushing 14 Thread down the threaded rod until the tip of the rod is approximately 1 inch...

Page 74: ...58 Eserver pSeries 690 Installation Guide...

Page 75: ...igation area click Problem Determination 3 In the Contents area click Microcode Maintenance The User Authentication window opens 4 Enter the HMC system unit s serial number and the password provided b...

Page 76: ...nnectors on it The cable is labeled ISA 8 Port Cable Serial cables can be connected from any of the ports on the 8 port expansion cable to the HMC1 ports on the managed systems If you are using a seco...

Page 77: ...sync Adapter Line Connectors The 128 Port async adapter has two 15 pin D shell connectors on it The connector that is closest to the edge connector that plugs into the HMC is line 1 The RANs are cable...

Page 78: ...00 0 100 AC To set the RAN node number do the following 1 Turn on the RAN and wait for the power on self test POST to complete 2 When P1 is displayed on the front panel seven segment LED display press...

Page 79: ...rd have Possible values v 8 v 16 v 24 v 32 v 40 v 48 v 56 v 64 v 72 v 80 v 88 v 96 v 104 v 112 v 120 v 128 Board 1 How many ports 1 16 Answer Count the total number of enhanced RANs you are attaching...

Page 80: ...async adapter perform the following 1 Move the rpm device package to the HMC 2 At the command prompt enter rpm i force epca 1 51 2 i386 rpm The device driver is installed as lib modules 2 4 9 12 misc...

Page 81: ...og in to the HMC the HMC management window opens and the management environment is already selected Select Partition Management to see the list of managed systems This window is divided into the Navig...

Page 82: ...Guide for additional information Verify that the installation is complete for each pSeries 690 that you have connected to the 8 port async adapter When you have finished the verification procedure go...

Page 83: ...4 3 5 6 7 8 9 1 Hardware Management Console 5 6 Primary 7040 Model 61R Integrated Battery Feature IBF Optional for the Primary Power Subsystem Redundant 7040 Model 61R Integrated Battery Feature IBF...

Page 84: ...cord of your components Component Serial Number pSeries 690 I O Drawer 1 I O Drawer 2 I O Drawer 3 I O Drawer 4 or Drawer 7 if installed I O Drawer 5 I O Drawer 6 I O Drawer 7 I O Drawer 8 68 Eserver...

Page 85: ...r U1 13 U1 13 P1 V1 or U1 13 U1 13 P2 V3 or U1 13 U1 35 P1 V3 U1 35 P2 V3 U1 18 F1 U1 18 X1 U1 18 F2 U1 18 X2 U1 35 P1 F1 U1 35 P2 F1 U1 18 P1 M1 U1 18 P1 M3 U1 18 P1 M2 U1 18 P1 M4 U1 18 P1 M5 U1 18...

Page 86: ...codes for the secondary rack These codes are used to identify the major functional units in the pSeries 690 systems REAR FRONT U2 17 P1 V5 U2 13 U2 13 U2 17 P2 V6 U2 9 U2 1 U2 1 U2 5 U2 5 U2 9 U2 19 U...

Page 87: ...v U1 18 P1 C6 v U1 18 P1 C7 v U1 18 P1 C10 v U1 18 P1 C11 L3 VPD Card U1 18 P1 H2 1 MCM 2 installed U1 18 P1 C4 MCM 2 VPD Card U1 18 P1 H2 4 Memory U1 18 P1 M6 Memory Book v 4 GB v 8 GB v 16 GB v 32...

Page 88: ...U1 18 P1 H2 6 Memory U1 18 P1 M1 Memory Book v 4 GB v 8 GB v 16 GB v 32 GB Memory U1 18 P1 M5 Memory Book v 4 GB v 8 GB v 16 GB v 32 GB L3 Modules v U1 18 P1 C5 v U1 18 P1 C9 v U1 18 P1 C13 v U1 18 P...

Page 89: ...adapters are in the available state If any adapters are in defined state contact your next level of support v Run lspv and count the number of hdisks hard disks that appear in the system Verify that...

Page 90: ...74 Eserver pSeries 690 Installation Guide...

Page 91: ...es subsystem positioning and cabling for the pSeries 690 Operator Panel Cable and Diskette Drive Cable to the Media Subsystem Rear View 1 Primary I O Book 3 Diskette Drive Data Cable 2 Cable Connectin...

Page 92: ...EIA 19 EIA 17 EIA 5 1 6 7 C3 C4 8 C1 Primary Rack 3 Third I O Subsystem C2 Secondary Rack 4 Fourth I O Subsystem C3 Blank Space 5 Fifth I O Subsystem C4 Blank Space 6 Sixth I O Subsystem 1 First I O...

Page 93: ...ck 4B Four IBFs primary rack Position 4 C2 Primary I O Book Book 0 5 Fifth I O Subsystem C3 Secondary Rack 6 Sixth I O Subsystem 1 First I O Subsystem 7 Seventh I O Subsystem 2 Second I O Subsystem 2B...

Page 94: ...rimary Rack 3 Third I O Subsystem C2 Secondary Rack 4 Fourth I O Subsystem 1 First I O Subsystem 4B Four IBFs 2 Second I O Subsystem Note The physical location shown for I O Subsystem 4 is populated o...

Page 95: ...A0 C0 A1 C1 B0 0 0 0 0 0 0 0 0 1 1 1 4 3 5 6 7 1 1 1 1 1 B1 D1 D0 1 2 1 Primary Rack 5 First I O Subsystem 2 Primary I O Book 6 Fourth I O Subsystem 3 Third I O Subsystem 7 Secondary I O Book 4 Secon...

Page 96: ...Shown Without IBFs C1 Primary Rack 5 Fifth I O Subsystem C2 Secondary Rack 6 Sixth I O Subsystem C3 Secondary I O Book Note RIO cabling to I O Subsystems 5 and 6 is the same for configurations with o...

Page 97: ...ry Rack 4B Two IBFs maximum Position 4 C3 Third I O Book Book 3 5 Fifth I O Subsystem 1 First I O Subsystem 6 Sixth I O Subsystem 2 Second I O Subsystem 7 Seventh I O Subsystem 3 Third I O Subsystem 8...

Page 98: ...ction to I O Book Book 0 2 Primary I O Book A1 Connection to I O Book Book 0 3 Third I O Subsystem B0 Connection to I O Book Book 0 4 Second I O Subsystem B1 Connection to I O Book Book 0 5 First I O...

Page 99: ...O Subsystem C4 Secondary I O Book in Slot 2 A0 Connection to I O Book Book 2 1 First I O Subsystem A1 Connection to I O Book Book 2 2 Second I O Subsystem B0 Connection to I O Book Book 2 3 Third I O...

Page 100: ...ixth I O Subsystem C3 Third I O Book Book 3 7 Seventh I O Subsystem 1 First O Subsystem 8 Eighth I O Subsystem 2 Second Subsystem C0 Connection to I O Book Book 3 3 Third I O Subsystem C1 Connection t...

Page 101: ...SCSI Cable for Media Subsystem Rear Drives 2 Primary I O Book 6 SCSI Cable for Media Subsystem Front Drives 3 Power Cable for Media Subsystem Front Drives 7 Power Cable for Media Subsystem Rear Drive...

Page 102: ...I O book in the managed system The following illustration shows the location of the serial ports on the back of the HMC and the HMC connectors located on the processor subsystem 1 Primary Rack 4 Prim...

Page 103: ...tion This appendix provides information about the location and label colors of the pSeries 690 cables Power Cabling 1 Front Rear 3 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 2 6 10 8 12...

Page 104: ...ripe 15 to 17 11P4303 1 I OB9 P00 to Media P02 16 to 18 11P4303 1 I OB9 P01 to Media P00 19 20 21 22 NA B35 BPDx P0x to I O Subsystem x RIO Cables and I O Power Cables on page 89 23 11P4462 1 B35 BPC...

Page 105: ...mary rack DCA2 P01 11P4505 1 I O Subsystem 4 power cable primary DCA2 P00 11P4514 1 I O Subsystem 4 power cable secondary rack DCA1 P01 11P4515 1 I O Subsystem 4 power cable secondary rack DCA1 P00 11...

Page 106: ...BPD1A P03 A05B DCA2 P01 BPD1A to I O Subsystem 2 Yellow W Stripes A35P BPD1B P03 A05B DCA2 P00 BPD1B to I O Subsystem 2 Yellow A35B BPD1A P04 A01B DCA1 P01 BPD1A to I O Subsystem 3 Green W Stripes A3...

Page 107: ...2B P02 Z05B DCA1 P00 BPD2B to I O Subsystem 6 Purple A35B BPD2A P03 Z05B DCA2 P01 BPD2A to I O Subsystem 6 Purple W Stripes A35P BPD2B P03 Z05B DCA2 P00 BPD2B to I O Subsystem 6 Purple A35B BPD2A P06...

Page 108: ...92 Eserver pSeries 690 Installation Guide...

Page 109: ...on the HMC 3 Start the service processor menus 4 Set the system name 5 Enable Surveillance 6 Configure call in call out 7 Attach modems if necessary If modem attachment is not necessary proceed to ste...

Page 110: ...System Power Control 3 Select Power On System When you are asked if you wish to continue powering on the system type Y 4 After the system firmware and operating system have initialized the server the...

Page 111: ...he sound of a telephone being dialed This is your computer trying to page you If this test is successful call out is working correctly Serial Port Configuration To configure the serial port on an AIX...

Page 112: ...96 Eserver pSeries 690 Installation Guide...

Page 113: ...refer to RPQ8A1173 For clearance procedures go to Removing the Rack Top Frame for Clearance Through Doorways on page 100 For the reduced height procedure go to Preparing for Rack Top Frame Installatio...

Page 114: ...on Ratchet 3 8 inches Square Drive Ratchet Accessories 3 8 inches Drive 6 inches Extension X2 8 inch reach required Drive Socket 3 8 inches 10mm Drive Ratchet 1 4 inches Drive Socket 5 16 inches 8mm T...

Page 115: ...ver Part Number 44P0127 9 Part Number 11P3535 Hinge Part Number 2665525 Screw 2 Rear Cover Part Number 44P0107 10 Part Number 11P1096 Front Latch Part Number 54G2882 Screw 3 Part Number 11P4106 Hinge...

Page 116: ...into the cover that lock it behind the left hand cover and these features must be clear before you can lift the cover from the frame Tilting the top of the cover away from the frame after the feature...

Page 117: ...1 2 3 1 Jam Nut 3 Rack Base 2 Leveling Foot Appendix J Removing and Installing the Rack Top Frame 101...

Page 118: ...ove the Bulk Power Controllers BPCs item 3 in the previous illustration as follows __ Step 1 Loosen the thumbscrew on each side of the BPC using the torque tool part number 6422789 __ Step 2 Pull the...

Page 119: ...from the rack 5 Remove the frame extenders as follows a Remove the UEPO switch item 6 in the following illustration as follows 1 Unplug the cables 2 Remove the top and bottom screws b Remove the rear...

Page 120: ...4 5 1 Top Extender 5 Front Extender 2 Left Extender 6 UEPO Switch 3 Right Extender 7 Rack Top Frame Left Side Cover 4 Rear Extender 8 Rack Top Frame Right Side Cover 104 Eserver pSeries 690 Installat...

Page 121: ...losure 2 Hex Head Screw Locations a Remove the five hex head screws from the front BPE b Remove the five hex head screws from the rear BPE Install 2 shipping brackets part number 11P2923 on both the f...

Page 122: ...llustration on page 106 at the middle left side of the rack top frame assembly Remove the screw then tilt the baffle toward the front of the rack top frame Note The foam and metal upright air baffle m...

Page 123: ...installation do the following 1 Unpack the frame 2 Unpack the rack top frame 3 Use the jack screws to stablize and lift the rack off the floor a Loosen the jam nut on each leveling foot by turning the...

Page 124: ...BPCs item 3 in the previous illustration as follows 1 Loosen the thumbscrew on each side of the BPC using the torque tool part number 6422789 2 Pull the BPC straight out from the Bulk Power Enclosure...

Page 125: ...ve any front and rear bulk power fillers 5 To reduce the weight to the maximum two person limit do the following 2 3 4 1 Front and Rear Rack Top Frame Top Panels 4 Foam and Metal Air Baffle 2 Rack Top...

Page 126: ...move the screw then tilt the baffle toward the front of the rack top frame Note The foam and metal upright air baffle must be reinstalled on the left side in their original location The foam baffle is...

Page 127: ...Adjust the leveling feet downward as needed until the rack is level When the rack is level tighten the jam nuts against the base by turning the nut clockwise 1 2 3 1 Jam Nut 3 Rack Base 2 Rack Base 2...

Page 128: ...height option RPQ8A1173 ship group 2 3 4 1 Rack Rack Top Frame 3 Top Frame Bolts 2 Rack Chassis 4 Rack Top Frame Cross Brace 112 Eserver pSeries 690 Installation Guide...

Page 129: ...Top Frame Cross Brace 3 Left and Right BPE Rails 5 Insert and align the foam air baffle item 4 in the illustration on page 113 to the left side of the rack top frame securing it in place with a screw...

Page 130: ...osure BPE b Tighten the thumbscrew on each side of the BPD using the torque tool pat number 6422789 c Repeat for the other BPDs There can be up to four BPDs with two in front and two in back 11 Instal...

Page 131: ...frame side covers items 7 and 8 in the following illustration 15 Attach all removed cables to the BPD If an IBF exists also attach all removed cables for the BPC and the BPR For cabling instructions...

Page 132: ...the frame extenders 1 8 7 2 3 4 5 1 Top Extender 5 Front Extender 2 Left Extender 6 UEPO Switch 3 Right Extender 7 Left Side Cover 4 Rear Extender 8 Right Side Cover 116 Eserver pSeries 690 Installat...

Page 133: ...nst the top of the cover to compress the gasket to allow alignment with the tapped holes in the top of the frame 5 Install the 2 inside screws and washers part numbers 77G0599 and 1625437 6 Install th...

Page 134: ...118 Eserver pSeries 690 Installation Guide...

Page 135: ...ther 6 connecting 128 port adapter cables 64 8 port adapter cables 60 CPU configuration 69 D device records 69 diagnostics online loading 29 standalone loading 30 stopping 32 door installation 25 E en...

Page 136: ...ental 39 safety vii O online diagnostics loading 29 online publications xiii operation hardware verifying 27 outlets 17 P parts information external cables 89 power cords 24 installation 19 routing 19...

Page 137: ...t service processor 93 standalone diagnostics loading 30 stopping diagnostics 32 switch EPO 15 system configuration minimum 5 other 6 inventory 7 power connection 19 records updating 33 relocation vii...

Page 138: ...122 Eserver pSeries 690 Installation Guide...

Page 139: ...isfied Satisfied Neutral Dissatisfied Very Dissatisfied Accurate h h h h h Complete h h h h h Easy to find h h h h h Easy to understand h h h h h Well organized h h h h h Applicable to your tasks h h...

Page 140: ...ESSEE Information Development Department H6DS 905 6C006 11501 Burnet Road Austin TX 78758 3493 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Page 141: ......

Page 142: ...IBMR Printed in U S A October 2002 SA38 0587 02...

Reviews: