__
14.
Install
two
clips
in
the
back
frame
B
.
__
15.
Attach
the
other
end
of
the
cable
management
arm
to
the
back
frame
by
installing
the
two
screws
C
where
the
clips
are
located.
__
16.
The
rack
shelf
and
rail
assembly
installation
is
complete.
__
17.
Continue
with
the
instructions.
Remove
devices
before
lifting
the
system
unit
into
the
rack
To
safely
lift
your
unit
onto
the
rack
shelf,
use
the
instructions
to
remove
devices
from
the
unit.
Place
devices
that
you
remove
in
the
electrostatic
discharge
bags
that
are
provided
to
prevent
damage.
After
removing
the
devices
to
get
the
system
unit
to
an
acceptable
weight,
three
people
are
needed
to
safely
lift
the
system
unit
onto
the
rack
shelf.
Continue
with
the
following
instructions.
14
270,
800,
810
In
Rack
Installation
Instructions
V5R3
Summary of Contents for Eserver i Series
Page 1: ...iSeries 270 800 and 810 units in a rack installation instructions Version 5 ERserver...
Page 2: ......
Page 3: ...iSeries 270 800 and 810 units in a rack installation instructions Version 5 ERserver...
Page 6: ...iv 270 800 810 In Rack Installation Instructions V5R3...
Page 11: ...__ 8 Open the back door Install a Model 270 800 or 810 in a rack 5...
Page 16: ...A Guidepins B Clips 10 270 800 810 In Rack Installation Instructions V5R3...
Page 35: ...__ 2 Install the access cover A Push in B Install a Model 270 800 or 810 in a rack 29...
Page 38: ...32 270 800 810 In Rack Installation Instructions V5R3...
Page 40: ...34 270 800 810 In Rack Installation Instructions V5R3...
Page 48: ...42 270 800 810 In Rack Installation Instructions V5R3...
Page 49: ......
Page 50: ...Printed in USA...