IBM DCS3700 Quick Start Manual Download Page 8

Installing the support rails and rear brackets

Note:

Use the front and rear rack-mounting templates on pages 19 and 20 to align the support rails and
rear brackets with the correct rack holes. If the support rails will be installed above an existing
storage subsystem or storage enclosure, position the DCS3700 or DCS3700 storage subsystem with
Performance Module Controllers support rails directly above it. If the support rails will be installed
below an existing storage subsystem or storage enclosure, allow 178 mm (7 inches) of vertical
clearance for the DCS3700 or DCS3700 storage subsystem with Performance Module Controllers.

To install the left and right support rails in the rack cabinet, complete the following steps. Use the front
and rear rack-mounting templates on pages 19 and 20 to align the support rails and rear brackets with
the correct rack holes. If the support rails will be installed above an existing storage subsystem or storage
enclosure, position the DCS3700 or DCS3700 storage systems with Performance Module Controllers
support rails directly above it. If the support rails will be installed below an existing storage subsystem
or storage enclosure, allow 178 mm (7 in.) of vertical clearance for the DCS3700 storage subsystem or
DCS3700 storage subsystem with Performance Module Controllers.

1.

Ensure that the rack has already been installed.

2.

Ensure that a stabilizer has been attached correctly to the bottom front of the rack to prevent the
rack from tipping forward while the storage enclosure is being installed.
Refer to the installation and service guide, or equivalent, for the rack as required.

3.

Locate the two support rails, eight M5 screws, and eight washers that are supplied with the storage
enclosure.

Note:

The screws and washers might already be attached to the support rails. If so, remove them
from the support rails.

4.

Starting with the left support rail, loosen the two rail adjustment screws with a medium flat-blade
screwdriver. The adjustment screws are used to lock the support rails at a certain length.

Note:

The support rails are not marked as left or right. However, each rail can be mounted correctly
on only one side of the rack cabinet. The rails should be mounted with the alignment pin at
the rear of the rack.

Front

Rear

Front rack
cabinet rail

Screws

Support
rail lip

Rail adjustment
screws

Rear rack
cabinet rail

Screws

5.

Hold the front of the left support rail against the inside of the front rack cabinet support flange, and
extend the rear of the support rail until it makes contact with the rear rack cabinet support flange.
The alignment pins at the rear of the support rail slide into the mounting holes at the rear of the
rack cabinet. The wider end of the support rail must be positioned at the front of the rack cabinet.

8

Summary of Contents for DCS3700

Page 1: ...installation of the storage enclosure involves the following procedures 1 Installation guidelines 2 Ordering the lift tool on page 4 3 Unpacking the shipping box on page 5 4 Installing the support ra...

Page 2: ...grounded outlet The storage enclosure accepts only 200 V 240 V input sources If you do not have an IBM rack with the supported PDUs and 60 A power cords check your PDUs or input sources to ensure that...

Page 3: ...00 Storage Subsystem and DCS3700 Storage Subsystem with Performance Module Controllers Installation User s and Maintenance Guide for additional information 2 Before you move or relocate a rack that co...

Page 4: ...employees with access to the IBM intranet For the SSR branch and territory the United States cannot order the lift tool through the parts ordering system UPS Logistics is used to ship and return the l...

Page 5: ...ve the DCS3700 storage subsystem or DCS3700 storage subsystem with Performance Module Controllers from the shipping box at this time v Six full or empty boxes of DDMs Note The DDMs are packaged ten pe...

Page 6: ...ule Controllers your shipping box might contain additional materials that are not shown in the following illustration Support rails Storage enclosure M5 x 8 mm screws 16 PDU jumper cord Rear brackets...

Page 7: ...he DCS3700 storage subsystem or DCS3700 storage subsystem with Performance Module Controllers do not ship with region specific ac power cords You must obtain the IBM approved power cords for your regi...

Page 8: ...rmance Module Controllers 1 Ensure that the rack has already been installed 2 Ensure that a stabilizer has been attached correctly to the bottom front of the rack to prevent the rack from tipping forw...

Page 9: ...t insert two M5 screws with washers through the rear of the cabinet and screw them into the support rail rear flange 9 Tighten the two rail adjustment screws with a medium flat blade screwdriver 10 Re...

Page 10: ...om of the handle in the opening in the storage enclosure chassis and push the handle in and up until the latch at the top of the handle secures the handle to the chassis 3 Repeat step 2 for the three...

Page 11: ...imum of two trained service technicians are required to push the enclosure out of its custom designed package and onto the lift tool If a lift tool is not available see Appendix E Component weights in...

Page 12: ...en all of the M5 screws to secure the rear of the storage enclosure to the rack cabinet 8 Turn the rear bracket thumbscrews to attach the rear brackets to the sides of the storage enclosure The screw...

Page 13: ...subsystem and DCS3700 storage subsystem with Performance Module Controllers but the DDMs are shipped separately from the drive drawers 2 Ensure that you install the storage enclosure in the rack cabin...

Page 14: ...DMs in the front row of the drive drawer 6 Push the drive drawer into the storage enclosure until it clicks and close the levers on each side of the drawer Attention Ensure you push both levers back a...

Page 15: ...u do not have an IBM rack with the supported PDUs and 60 A power cords check your PDUs or input sources to ensure that they can handle the DCS3700 or DCS3700 storage subsystem with Performance Module...

Page 16: ...workstation and locate the applicable directory for your operating system Note The type of operating system that the management station runs is the directory that you must locate on the DS Storage Ma...

Page 17: ...ler A is 192 168 128 101 v Port 2 on controller A is 192 168 129 101 v Port 1 on controller B is 192 168 128 102 v Port 2 on controller B is 192 168 129 102 v The subnet mask for both Ethernet ports i...

Page 18: ...tion and click Continue Note For detailed information about device driver and firmware versions ensure that you read the readme files that are posted with each package Updating the storage subsystem f...

Page 19: ...1U 0U 0U Rail assembly front left Rail assembly front right FRONT Rack Mounting Template 4U 4U Install second Install first Install second Install first Install first Install first Install second Ins...

Page 20: ...3U 3U 2U 2U 1U 1U 0U 0U Rail assembly rear left Rail assembly rear right Printed in the U S A REAR Rack Mounting Template Rail mounting guide 4U 4U Rear bracket Rear bracket 20...

Page 21: ...ed States other countries or both Microsoft and Windows are trademarks of Microsoft Corporation in the United States other countries or both Copyright IBM Corporation 2012 US Government Users Restrict...

Reviews: