4. Loosen and remove the M4 screws attaching the mounting bracket on each side
of the switch.
5
6
Removing the RackSwitch from a System x or Power rack
To remove the RackSwitch from a System x or power rack, complete the following
steps:
1. Disconnect all cables.
2. Loosen and remove M3 screws that secure the rear brackets to the front
brackets.
9
10 11
3
3. Loosen and remove M6 washers, screws, and clip nuts that attach the filler
plate to the rear mounting brackets.
36
IBM System Networking RackSwitch G8124 and G8124-E: Installation Guide
Summary of Contents for BNT RackSwitch G8124
Page 1: ...IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 2: ......
Page 3: ...IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 7: ...DANGER Rack mounted devices are not to be used as shelves or work spaces L002 Safety v...
Page 9: ...Safety vii...
Page 14: ...xii IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 64: ...48 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 72: ...56 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 76: ...60 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 84: ...68 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Page 87: ......
Page 88: ...Part Number 00AY390 Printed in USA 1P P N 00AY390...