
If you have selected the NS Boot for Network Station Manager configuration
option for your Network Station, refer to the “Chapter 10. Startup sequence of
Network Stations configured for the IBM Network Station Manager program” on
page 67. See “Part 3. Configuring the Network Station” on page 37 for the procedure
to return to the Change Firmware Support menu from the NS Boot for
Network Station Manager
configuration option.
10.
IBM Network Station
appears on the screen.
11.
The testing of the keyboard device begins.
12.
The keyboard LEDs flash.
13.
The Network Station runs the network initialization code.
14.
The Network Station initializes the first device in the startup sequence.
15.
The Network Station contacts the server.
16.
The Network Station requests the code to download the operating system
kernel from the server.
17.
The operating system kernel initializes.
18.
The WorkSpace On-Demand user login initializes and displays on the
screen.
92
IBM Network Station
Summary of Contents for 8364 E series
Page 2: ......
Page 7: ...Readers Comments We d Like to Hear from You 135 Contents v ...
Page 8: ...vi IBM Network Station ...
Page 14: ...2 IBM Network Station ...
Page 40: ...28 IBM Network Station ...
Page 42: ...30 IBM Network Station ...
Page 50: ...38 IBM Network Station ...
Page 54: ...42 IBM Network Station ...
Page 76: ...64 IBM Network Station ...
Page 78: ...66 IBM Network Station ...
Page 100: ...88 IBM Network Station ...
Page 102: ...90 IBM Network Station ...
Page 120: ...108 IBM Network Station ...
Page 121: ...Part 6 Appendixes Copyright IBM Corp 1999 109 ...
Page 122: ...110 IBM Network Station ...
Page 128: ...116 IBM Network Station ...
Page 132: ...120 IBM Network Station ...
Page 140: ...128 IBM Network Station ...
Page 149: ......