I/O Drawer 5 EIA
This I/O drawer is used with several of the system CEC drawers. It is used as primary and secondary I/O
drawer for those systems.
Dimensions
Height
218.0 mm 8.6 in.
Width
445.0 mm 17.5 in.
Depth
820.0 mm 32.3 in.
Weight
Minimum configuration
41 kg 90 lbs.
Maximum configuration
52 kg 115 lbs.
Electrical
Power source loading (typical in kVA)
0.23
Power source loading (maximum in
kVA)
0.54
Voltage range
200 to 240 V ac
Frequency (hertz)
50 / 60
Thermal output (typical)
750 Btu/hr
Thermal output (maximum)
1750 Btu/hr
Power requirements (typical)
220 watts
Power requirements (maximum)
515 watts
Power factor
0.95
Inrush current
³
41 amps
Maximum altitude
2135 m (7000 ft.)
Temperature Requirements
Operating
10 to 40°C
(50 to 104°F)
Non-Operating
10 to 52°C
(50 to 125.6°F)
Humidity (Noncondensing)
Operating
Non-Operating
Without tape drive
8 to 80%
8 to 80%
With tape drive
20 to 80%
20 to 80%
Wet Bulb Requirements
Without tape drive
27°C (80°F)
27°C (80°F)
With tape drive
23°C (73°F)
27°C (80°F)
Noise Emissions
1,2
Operating
Idle
L
WAd
5.8 bels
5.8 bels
L
pAm
N/A
N/A
<L
pA
>
m
45 dBA
45 dBA
Impulsive or prominent discrete tones
No
No
Clearances
Front
Back
Left
Right
Install/Air Flow
Maintenance of a proper service clearance should allow proper air flow.
Service
(See “Service Clearances for System in an S70, S7A, or S80 I/O Rack” on
page 54)
1. See “Noise Emission Notes” on page 336 for definitions of noise emissions positions.
2. Noise emissions data are based on the following configuration: the drawer is mounted in a T00 Rack and a
power distribution unit.
3. Inrush currents occur only at initial application of power, no inrush occurs during normal power off-on cycle.
Chapter 2. Physical Characteristics of Systems
79
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...