S7A, S80, and S85 SCSI I/O Drawer 10 EIA
Dimensions
Height
440.0 mm 17.3 in.
Width
443.2 mm 17.5 in.
Depth
843.2 mm 33.2 in.
Weight
Minimum configuration
89 kg 195 lbs.
Maximum configuration
93 kg 205 lbs.
Electrical
AC
DC
Power source loading
0.4
0.4
(typical in kVA)
Power source loading
1.0
1.0
(maximum in kVA)
Voltage range
200 to 240 V ac
40 to 60 VDC
Frequency (hertz)
50 / 60
NA
Thermal output (typical)
1228 Btu/hr
1365 Btu/hr
Thermal output (maximum)
3071 Btu/hr
3412 Btu/hr
Power requirements (typical)
360 watts
400 watts
Power requirements (maximum)
900 watts
1000 watts
Power factor
0.9
N/A
Inrush current
³
170 amps
300 amps
Maximum altitude
2135 m (7000 ft.)
2135 m (7000 ft.)
Temperature Requirements
⁴
Operating
16 to 32°C
⁴
(60 to 90°F)
Non-Operating
10 to 43°C
(50 to 110°F)
Humidity (Noncondensing)
Operating
Non-Operating
Without tape drive
8 to 80%
8 to 80%
With tape drive
20 to 80%
20 to 80%
Wet Bulb Requirements
Without tape drive
27°C (80°F)
27°C (80°F)
With tape drive
23°C (73°F)
27°C (80°F)
Noise Emissions
1,2
Operating
Idle
L
WAd
5.5 bels
5.4 bels
L
pAm
N/A
N/A
<L
pA
>
m
37 dBA
36 dBA
Impulsive or prominent discrete
tones
No
No
Clearances
Front
Back
Left
Right
Install/Air Flow
Maintenance of a proper service clearance should allow proper air flow.
Service
(See “Service Clearances for System in an S70, S7A, or S80 I/O Rack” on
page 54)
1. See “Noise Emission Notes” on page 336 for definitions of noise emissions positions.
2. Noise emissions data for the Model S7A, SCSI I/O Drawer 7 EIA are based on the I/O drawer mounted in a rack.
3. Inrush currents occur only at initial application of power, no inrush occurs during normal power off-on cycle.
Chapter 2. Physical Characteristics of Systems
53
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...