Enterprise Server Models S70 and S7A (7017, 7013, 7015)
System Rack
Dimensions
Height
1577 mm
62.0 in.
Width
567 mm
22.3 in.
Depth
1041 mm
40.9 in.
Weight
Minimum
400 kg
880 lbs.
(Configuration
dependant)
Electrical
Power source loading
1.887KVA
(maximum in kVA)
Voltage range (V ac)
200 to 240
Frequency (hertz)
50 - 60
Thermal output
(Maximum)
5796 Btu/hr
Power requirements
(Maximum)
1698 watts
Power factor
0.9
Inrush current
³
102 amps
Maximum altitude
2135 m (7000 ft.)
Temperature
Requirements
4,5
Operating
10 to 37.8°C
(50 to 100°F)
Non-Operating
1 to 60°C
(34 to 140°F)
Humidity
Operating
Non-Operating
Noncondensing
8 to 80%
8 to 80%
Wet Bulb
Requirements
⁶
23°C (73°F)
23°C (73°F)
Noise Emissions
1,2
Operating
Idle
L
WAd
7.0 bels
7.0 bels
L
pAm
N/A
N/A
<L
pA
>
m
N/A
N/A
Impulsive or prominen
discrete tones
No
No
Clearances
Front
Back
Left
Right
Install/Air Flow
Maintenance of a proper service clearance should allow proper air flow.
Service
See “Service Clearances for System in an S70, S7A, or S80 I/O Rack” on page 54.
1. See “Noise Emission Notes” on page 336 for definitions of noise emissions positions.
2. Noise emissions data for Models S70 and S7A are based on a system with the doors closed.
3. Inrush currents occur only at initial application of power, no inrush occurs during normal power off-on cycle.
4. The use of the PCI SSA Multi-Initiater/RAID EL in the Model S70 I/O Drawer limits the system usage to a 28°C
(82°F) environment maximum.
5. The upper limit of the dry bulb temperature must be derated 1 degree C per 137M (450 ft.) above 1295M (4250
ft.)
6. The upper limit of the wet bulb temperature must be derated 1 degree C per 274M (882 ft.) elevation above
1370M (4500 ft.)
46
Site and Hardware Planning Information
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...