7012 Models G30, G40, and G02
Dimensions
G30 & G40
G02
Height
450 mm
17.75 in.
450 mm
17.75 in.
Width
173 mm
6.9 in.
173 mm
6.9 in.
Width (at pedestal)
280 mm
11 in.
280 mm
11 in.
Depth
613 mm
24.1 in.
613 mm
24.1 in.
Weight
G30 & G40
G02
Minimum
19 kg
43 lbs.
19 kg
43 kg
Maximum
25 kg
55 lbs.
25 lbs.
55 lbs.
Electrical
G30 & G40
G02
Power source loading (typical in
kVA)
0.45
0.2
Voltage range (V ac)
100 to 125 or 200 to
100 to 125 or 200 to
240 (autoranging)
240 (autoranging)
Frequency (hertz)
50 or 60
50 or 60
Thermal output (typical)
1380 Btu/hr
615 Btu/hr
Power requirements (typical)
405 watts
180 watts
Power factor
0.8 to 1.0
0.8 to 1.0
Inrush current
³
35 amps at 120 V ac
35 amps at 120 V ac
70 amps at 240 V ac
70 amps at 240 V ac
Maximum altitude
2135 m (7000 ft.)
2135 m (7000 ft.)
Temperature Requirements
Operating
16 to 32°C
(60 to 90°F)
Non-Operating
10 to 43°C
(50 to 110°F)
Humidity Requirements
Operating
Non-Operating
(Noncondensing)
Without tape drive
8 to 80%
8 to 80%
With tape drive
20 to 80%
20 to 80%
Wet Bulb Requirements
Without tape drive
27°C (80°F)
27°C (80°F)
With tape drive
23°C (73°F)
27°C (80°F)
Noise Emissions
¹
Operating
Idle
L
WAd
5.8 bels
5.5 bels
L
pAm
39 dBA
37 dBA
<L
pA
>
m
39 dBA
37 dBA
Impulsive or prominent discrete
tones
No
No
Clearances
Front
Back
Left
Right
Install/Air Flow
²
152 mm(6 in)
152 mm(6 in)
N/A
N/A
Service
760 mm(30 in)
N/A
N/A
N/A
Footprint
2
Width
280mm(11 in)
Depth
917mm(36.1 in)
1. See “Noise Emission Notes” on page 336 for definitions of noise emissions positions.
2. The amount of space needed by the unit during normal operation is indicated by the footprint dimensions.
3. Inrush currents occur only at initial application of power, no inrush occurs during normal power off-on cycle.
Chapter 2. Physical Characteristics of Systems
21
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...