2101 Model 100 Service Clearances
Note:
For more information, see the following Website: http://www.ibm.com/storage/.
Note:
Rack units are large and heavy, and they are not easily moved. Because maintenance activities
require access at both the front and back, extra room must be allowed. The illustration shows the
minimum space required.
For multiple racks placed side by side, the left and right clearances apply only to the leftmost and
rightmost rack. For five to six racks placed side by side, the left and right clearances need to be increased
to 1525 mm (60 in). Having more than six racks side by side is not recommended.
Not to scale
Not to scale
See notes
below
See notes
below
Front
915 mm (36 in)
Rear
915 mm (36 in)
Side
915 mm
(36 in)
Side
915 mm
(36 in)
Rack
230
Site and Hardware Planning Information
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...