General Considerations
When determining the placement of your system, consider the following:
v
Adequate space for the devices.
v
Working environment of personnel who will be using the devices (their comfort, ability to access the
devices, supplies, and reference materials).
v
Adequate space for maintaining and servicing the devices.
v
Physical security requirements necessary for the devices.
v
Weight of the devices.
v
Heat output of the devices.
v
Operating temperature requirements of the devices.
– When using tape media, the maximum operating temperature is 16 to 32°C (60 to 90°F). The
maximum operating wet bulb temperature is 23°C (73°F), unless otherwise specified in the system
specifications
v
Humidity requirements of the devices.
– When using tape media, the humidity is 20 to 80%.
v
Air flow requirements of the devices.
v
Air quality of the location where the devices will be used. (For example, excess dust could damage your
system.)
Note:
The system and devices are designed to operate in normal office environments. Dirty or other
poor environments may damage the system or the devices. The customer is responsible for
providing the proper operating environment.
v
Altitude limitations of the devices.
v
Noise emission levels of the devices.
v
Any vibration of equipment near where the devices will be placed.
v
Paths of power cords.
The following pages contain the information you need to evaluate these considerations.
6
Site and Hardware Planning Information
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...