9112 Model 265
The Model 265 is either a 1–way or 2–way system. The system can accommodate two processor cards,
one memory card with 16 DIMMs, and 5 PCI adapters. It supports six hot-swap DASD bays and one
floppy drive.
Dimensions
Height
426 mm (16.8 in.)
Width
215 mm (8.5 in.)
Depth
617 mm (24 in.)
Weight
Minimum configuration
35.5 kg 78 lbs.
Maximum configuration
43.1 kg 94.8 lbs.
Electrical
Power source loading (maximum in
kVA)
0.40
Power source loading (typical in
kVA)
0.30
Voltage range (V ac)
100 to 127 or 200 to 240 (autoranging)
Frequency (hertz)
50 or 60
Thermal output (maximum)
1306 Btu/hr
Thermal output (typical)
979 Btu/hr
Power requirements (maximum)
384 watts
Power requirements (typical)
288 watts
Power factor - US, World Trade,
Japan
0.96
Inrush current
²
70 amps
Maximum altitude
2135 m (7000 ft.)
Temperature Requirements
³
Operating
16 to 32°C
(61 to 90°F)
Non-Operating
10 to 43°C
(50 to 109°F)
Humidity Requirements
⁴
Operating
Non-Operating
(Noncondensing)
8 to 80%
8 to 80%
Wet Bulb
27°C (80°F)
27°C (80°F)
Noise Emissions
¹
Operating
Idle
L
WAd
6.1 bels
6.1 bels
L
pAm
42 dBA
41 dBA
Impulsive or prominent discrete
tones
No
No
Install/Air Flow
Maintenance of proper service clearance should allow proper air flow.
Service
See service clearances for the 7014 T00 Rack
4.
2. Inrush currents occur only at initial application of power, no inrush occurs during normal power off-on cycle.
3. The upper limit of the dry bulb temperature must be derated 1 degree C per 137 m (450 ft.) above 915 m (3000
ft.).
4. The upper limit of the wet bulb temperature must be derated 1 degree C per 274 m (900 ft. ) above 305 m (1000
ft.).
5. Levels are for a single system installed in a T00 32 EIA rack with the center of the unit approximately 1500 mm
(59 in.) off the floor.
Chapter 2. Physical Characteristics of Systems
213
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...