7038 Model 6M2 (
Eserver
pSeries 650)
Dimensions
Height
351 mm (13.8 in)
Width
445 mm (17.5 in.)
Depth
760 mm (29.9 in.)
Weight
93 kg (205 lbs)
Electrical
Power source loading (typical)
8-way processor: 1.126 kVA
Power source loading (max.)
8-way processor: 1.684 kVA
Voltage range
200 to 240 V ac, V dc not supported
Frequency
50 or 60 Hz
Thermal output (typical)
8-way processor: 3,652Btu/hr
Thermal output (max.)
8-way processor: 5,461 Btu/hr
Power requirements (typical)
8-way processor: 1,070 watts
Power requirements (max.)
8-way processor: 1,600 watts
Power factor
0.95
Inrush current
²
67 amps at 200 V ac, 60 Hz
87 amps at 230 V ac, 50 Hz
Maximum altitude
3, 4
3048 m (10000 ft.)
Temperature Requirements
³
Operating
10 to 38°C
(50 to 100°F)
Non-Operating
1 to 43°C
(34 to 109°F)
Storage
1 to 60°C
(34 to 140°F)
Humidity Requirements
⁴
Operating
Non-Operating
Storage
(Noncondensing)
8 to 80%
8 to 80%
5 to 80%
Wet Bulb
23°C (73°F)
27°C (81°F)
29°C (84.2°F)
Noise Emissions
1, 5, 6
Operating
Idle
L
WAd
6.1 bels
5
6.1 bels
5
<L
pA
>
m
44 dBA
6
44 dBA
6
Install/Air Flow
Maintenance of service clearance will allow proper air flow.
Service Clearances
See “T00 and T42 Service Clearances and Caster Location” on page 33 for T00 or
T42 rack service clearances.
4.
2. Inrush currents occur only at initial application of power, no inrush occurs during normal power off-on cycle.
3. The upper limit of the dry bulb temperature must be derated 1°C per 137 m (450 ft.) above 915 m (3000 ft.).
4. The upper limit of the wet bulb temperature must be derated 1°C per 274 m (900 ft. ) above 305 m (1000 ft.).
5. The
L
WAd
emission increases to 6.5 bels with a configuration of one 7038-6M2 and four 7311-D10 drawers.
6. The
L
pA
>
m
emission increases to 48 dBA with a configuration of one 7038-6M2 and four 7311-D10 drawers.
86
Site and Hardware Planning Information
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...