![IBC SL 10-85 G3 Installation & Operating Manual Download Page 84](http://html1.mh-extra.com/html/ibc/sl-10-85-g3/sl-10-85-g3_installation-and-operating-manual_605137084.webp)
Boiler
Component
Maintenance Required
Frequency
Check
test again to try and flush any debris that may be lodged
in the valve. If repeated tries fail to stop the leakage,
contact a licensed contractor or qualified service
personnel to replace the valve.
While performing a "try lever test", a quantity of heat
transfer fluid will be discharged from the piping system
and the system pressure will drop. This fluid must be
replaced. To refill and pressurize your system, we
recommend using a system pressurization appliance
such as an Axiom Industries model SF100 series.
Capture the discharged fluid in a container and recycle
it by returning it to the system feeder appliance. This is
particularly important when your system contains
treatment chemicals or glycol solutions. If the system
employs plain water, the boiler auto fill valve must be
turned on in order to recharge the lost fluid.
7.3 Replacing the fan, gas valve, and burner
This section documents the following maintenance procedures:
Replacing the fan
Replacing the gas valve
Replacing the burner.
80
Section: Service and maintenance
Summary of Contents for SL 10-85 G3
Page 8: ...Intentionally left empty ...
Page 14: ...Intentionally left empty ...
Page 66: ...Figure 49 Electric wiring connections 62 Section Installation ...
Page 78: ...Intentionally left empty ...
Page 92: ...Intentionally left empty ...
Page 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices ...
Page 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation ...
Page 109: ...105 Exploded views of boiler parts ...
Page 114: ...110 Section Appendices ...
Page 122: ...Intentionally left empty ...