background image

 

NOTE

 

 

These instructions are to be closely followed, and referenced to the 
details in the boiler’s current certified Installation and Operating 
Instruction Manual.

 

 

WARNING

 

For your safety, turn off electrical power supply at service panel and allow unit to cool before proceeding. Failure to do 
so can cause severe personal injury or death. The ability to properly perform service on this equipment requires 
certain expertise, mechanical skills, tools, and equipment. If you do not possess these, do not attempt to perform any 
service on this equipment. A failure to follow this warning could result in possible damage to this equipment, serious 
personal injury, or death. 
 

 

NOTE

 

Installing and servicing boiler 
equipment, parts and 
accessories, can be 
hazardous due to gas and 
electrical components. 

Only trained personnel 
should install or service 
heating equipment.

When working on boiler 
equipment, observe 
precautions in the literature, 
on tags, and on labels 
attached to the unit.

www.ibcboiler.com

October 29, 2019

Page 1 of 2

Cleaning the DC and HC Series Heat Exchangers

Like any condensing appliance, the IBC DC- and HC-series boiler / water heaters must be regularly inspected and 
maintained.  

Part of performing an annual maintenance is being prepared to clean a heat exchanger when it’s required; buildup 
from the products of combustion are typically concentrated on the bottom half of the heat exchanger where cooler 
water has caused flue gases to condense.

How to Access the Heat Exchanger for Cleaning

1.  Remove any call for heat, and power off the boiler / water heater. 

2.  Remove cabinet front door panel and allow the boiler to cool.  There is no need to drain the boiler’s water unless 
the boiler will be subject to freezing conditions while the boiler is off.

3. Lay a plastic barrier over the bottom of the boiler cabinet to protect the electronics beneath from water in the 
condensate assembly and from spillage during the cleaning process.

4. Turn off the gas supply.

5. Disconnect the flue pipe from the condensate tray by rotating the nut counter-clockwise about ¼ turn. Slide the 
flue pipe up and dis-engage the bottom of the flue pipe from the condensate tray and slide down to remove.

6. Unplug the electrical connectors at the gas valve and both connectors to the fan.

INSTRUCTIONAL 
NOTE

Heat Exchanger Cleaning

DC / HC Series (all models)

Table 1:  Heat Exchanger Service Kits by Boiler / Water heater model

HEAT EXCHANGER 

SERVICE KIT PART #

BOILER MODEL

DC Series – DC 23-84
HC Series – HC 13-50, HC 23-84

P-713

DC Series – DC 29-106
HC Series – HC 29-106

P-714

DC Series – DC 15-96, DC 33-124, DC 20-125, DC 33-160

HC Series – HC 15-96, HC 33-124, HC 20-125, HC 33-160

P-715

Figure 1: Heat Exchanger Gasket from P-715

7. Loosen the lower gas valve connection nut. NOTE: 
There is an O-ring in the lower gas connection. Remove 
the two 8mm nuts on the outlet of the fan; remove the 
entire fan and gas valve assembly.  Place this in a safe 
location to be used for re-assembly. Cover the gas 
piping connections to prevent debris from entering the 
gas piping.  

8. CAUTION: When removing the heat exchanger front 
cover in step 9, be careful not to damage the burner 
and refractory material located on the opposite side of 
the heat exchanger cover. Use caution when handling 
refractory materials. See CAUTION sidebar over.

Reviews: