background image

 

IAG Performance | 1203 Baltimore Blvd. Westminster, MD 21157 | Ph: 410-840-3555 | www.iagperformance.com 

 

IAG Battery Tie Down 

Part# IAG-ENG-5014BK / BL / RD / SL  
Tools Required: 10mm wrench / 10mm Deep Socket (1/4” 
drive preferred) / ratchet  
Contents

Tie Down (x1) 
6mm Zinc Coated Flange Nuts (x2) 
Short J-hook (x1) 
Long J-hook (x1) 
 
Thank you for choosing IAG Performance. The battery tie 
down is designed to secure a group 35 sized battery in 
your engine bay and pay homage to the boxer engine. 
Supplied with your tie down are new j-hooks and flange 
nuts. Our tie down was tested utilizing several group 35 
batteries from different manufactures. Your OEM battery 
or OEM replacement battery should closely match the 
dimensions listed below: 
 
L=9” / W=6.875” / H=8.75” 
 
 

Please follow the instructions below for an easy 

installation. 

 

 

 

Removal

1. Using your 10mm wrench, disconnect the negative 
battery terminal. 
 
 
 

 

1. 

Summary of Contents for IAG-ENG-5014BK

Page 1: ...Performance The battery tie down is designed to secure a group 35 sized battery in your engine bay and pay homage to the boxer engine Supplied with your tie down are new j hooks and flange nuts Our tie down was tested utilizing several group 35 batteries from different manufactures Your OEM battery or OEM replacement battery should closely match the dimensions listed below L 9 W 6 875 H 8 75 Pleas...

Page 2: ...10mm socket and ratchet remove the nuts holding the existing tie down on top of the battery 2 2 2 3 Remove the factory tie down and set aside Take note of where the bottoms of the j hooks are secured Gently push down on the old j hooks to dislodge them from the engine bay Set them aside with your old hardware 3 ...

Page 3: ...efer 4 5 Pull the short j hook through the bottom of the tie down on the back side of the battery and hook it into the chassis Thread a flange nut onto the j hook until it is hand tight 5 6 Pull the long j hook through the bottom of the tie down on the front side of the battery Thread a flange nut down several turns Now push the j hook down and secure the j hook into the chassis Hand tighten the n...

Page 4: ...chet and socket to tighten the flange nuts 7 8 Re install the battery terminal and enjoy your new tie down 8 Tech Tip If you are replacing your battery at the same time make sure your bottom tray is set correctly Make sure the dimples on the tray are aligned with the corresponding holes in the chassis Tech Tip 1 ...

Page 5: ...IAG Performance 1203 Baltimore Blvd Westminster MD 21157 Ph 410 840 3555 www iagperformance com 5 Tech Tip 1 ...

Reviews: