Maintenance
HPR400XD Auto Gas –
806160
5-33
coolant system servicing
Draining the coolant system
2. Remove the return coolant hose (red washer on the cooler fitting) from the rear of the cooler and put it in a 20 liter
(5 gallon) container.
4. Turn OFF the pump when the coolant stops flowing.
3.
Turn ON the pump manually, using the manual pump control button on your CNC screen.
1. Turn OFF all power to the system.
Summary of Contents for HyPerformance Plasma HPR400
Page 1: ...HyPerformance Plasma HPR400XD Auto gas Instruction manual 806160 Revision 4 ...
Page 26: ...Specifications 2 2 HPR400XD Auto Gas 806160 ...
Page 48: ...Installation 3 10 HPR400XD Auto Gas 806160 ...
Page 53: ...Installation HPR400XD Auto Gas 806160 3 15 Horizontal RHF mounting Vertical RHF mounting ...
Page 57: ...Installation HPR400XD Auto Gas 806160 3 19 This page is blank intentionally ...
Page 65: ...Installation HPR400XD Auto Gas 806160 3 27 7 8 8 7 ...
Page 100: ...Installation 3 62 HPR400XD Auto Gas 806160 ...
Page 107: ...Operation HPR400XD Auto Gas 806160 4 7 Diagnostic screen ...
Page 108: ...Operation 4 8 HPR400XD Auto Gas 806160 Test screen ...
Page 109: ...Operation HPR400XD Auto Gas 806160 4 9 Cut chart screen ...
Page 197: ...Operation HPR400XD Auto Gas 806160 4 97 ...
Page 287: ...7 4 HPR400XD Auto Gas 806160 Discrete output functionality ...
Page 347: ...Appendix B CNC Interface Protocol b 28 HPR400XD Auto Gas 806160 ...
Page 355: ...4 HPR400XD Auto Gas 806160 ...