InstallatIon
3-50
HPR130XD Auto Gas –
806330
Fill the power supply with coolant
The system will take 11.4 – 15.1 liters (3 to 4 gallons) of coolant depending on the length of the torch leads and
whether the system has a local or remote ignition console.
3. Locate the CNC screen for manual pump
control. The pump needs to run to fill the leads.
4. Add coolant to the power supply until
the tank is full and replace the filler cap.
1. Add coolant to the power supply until the
tank is full.
2. Turn ON the power supply using the remote
ON/OFF switch or the CNC.
caution:
Using the wrong coolant can cause damage to the system. Refer to
torch
coolant requirements
in this section for more information.
Do not over fill the coolant tank.
Summary of Contents for HyPerformance HPR130XD
Page 1: ...HyPerformance Plasma HPR130XD Auto gas Instruction manual 806330 Revision 3 ...
Page 16: ...Table of Contents viii HPR130XD Auto Gas 806330 ...
Page 26: ...Specifications 2 2 HPR130XD Auto Gas 806330 ...
Page 38: ...Specifications 2 14 HPR130XD Auto Gas 806330 ...
Page 48: ...Installation 3 10 HPR130XD Auto Gas 806330 ...
Page 59: ...Installation HPR130XD Auto Gas 806330 3 21 1X1 J103 J300 Female Male 5 6 5 6 3X1 3X2 3X3 3X4 ...
Page 94: ...Installation 3 56 HPR130XD Auto Gas 806330 ...
Page 101: ...Operation HPR130XD Auto Gas 806330 Revision 2 4 7 Diagnostics screen ...
Page 102: ...Operation 4 8 HPR130XD Auto Gas 806330 Revision 2 Test screen ...
Page 103: ...Operation HPR130XD Auto Gas 806330 Revision 2 4 9 Cut chart screen ...
Page 152: ...Operation 4 58 HPR130XD Auto Gas 806330 Revision 2 ...
Page 236: ...7 4 HPR130XD Auto Gas 806330 Discrete output functionality ...
Page 294: ...Appendix B CNC Interface Protocol b 28 HPR130XD Auto Gas 806330 Revision 1 ...
Page 302: ...4 HPR130XD Auto Gas 806330 ...