Installation
8
DynaMAX 550P/560P/575P Waterjet Pump
Operator Manual
811390
195
Install the external heat exchanger (optional)
Parts, tools, and materials
1.
Use the attached mounting bars to secure the heat exchanger to the ground or on an elevated
platform.
2.
Locate the wiring access hole in the bottom of the electrical enclosure.
3.
Remove the wing nut holding the hole plug.
4.
Put the cord grip connector on the cord.
5.
Put the cord and the threaded end of the cord grip connector through the wiring access hole.
6.
Put the lock nut on the cord grip connector.
7.
Connect the motor wires (L1, L2, and L3) to the motor starter. Connect the ground wire to the
grounding lug (PE).
DynaMAX pumps have 1-inch hydraulic hoses with 1-5/8-inch hex fasteners.
Keep these parts to use if the pump is stored or shipped.
Air-cooled system kit
24 mm or 15/16-inch open-ended wrench
(for the cord grip base)
1-1/16-inch open-ended wrench
(for the sealing locknut)
Summary of Contents for DynaMAX 550P
Page 1: ...DynaMAX 550P 560P 575P Waterjet Pump Operator Manual 811390 REVISION 0 ENGLISH...
Page 16: ...Product stewardship 16 811390 Operator Manual DynaMAX 550P 560P 575P Waterjet Pump...
Page 46: ...Optional equipment 2 46 811390 Operator Manual DynaMAX 550P 560P 575P Waterjet Pump...
Page 64: ...Operation 3 64 811390 Operator Manual DynaMAX550P 560P 575P Waterjet Pump...
Page 136: ...Preventive maintenance 4 136 811390 Operator Manual DynaMAX 550P 560P 575P Waterjet Pump...
Page 146: ...Parts lists 5 146 811390 Operator Manual DynaMAX 550P 560P 575P Waterjet Pump...
Page 172: ...Troubleshooting 6 172 811390 Operator Manual DynaMAX 550P 560P 575P Waterjet Pump...
Page 222: ...Technical drawings 10 222 811390 Operator Manual DynaMAX 550P 560P 575P Waterjet Pump...
Page 223: ...Technical drawings 10 DynaMAX 550P 560P 575P Waterjet Pump Operator Manual 811390 223...