User Guide
3
INS2051 Rev A
Connecting the Thermal Block
The Automated Thermal Block is pre-programmed to perform the sequential heating and cooling
steps needed for BAX System assays. No calibration or software installation is required when the
thermal block is used as specified.
Follow these steps to connect the thermal block:
1. Place the thermal block unit on a level, dry laboratory workbench. Allow at least 4 inches
(10 cm) on all sides of the unit for ventilation.
2. Insert one end of the provided power cord into the power supply and plug the other end
of the power cord into a 3-wire outlet.
Note: Ensure the outlet is properly grounded and runs the appropriate voltage (see specifications
on the previous page).
3. Insert the power supply jack into the power input port on the back panel of the thermal
block.
4. Seat the metal tube holder over the metal plate surface on the top of the thermal block
unit.
Summary of Contents for DUP-1000
Page 1: ...Model DUP 1000 User Guide...