Page 29
7.4 Connection diagram
The device-specific wiring diagrams are
included in the scope of delivery. Please use
them for the installation and keep them in a
safe place.
7.5 Electrical installation check
list
Check electrical installation with respect to
customer-site requirements and local power
supply regulations.
Safety interlock properly wired
across terminals 1 and 2?
Supply voltage in accordance with
name plate voltage rating?
All ectrical connections made accor-
ding to the wiring diagram?
Is the sensor (temperature sensor or
r.h. sensor, depending on the appli-
cation scenario) properly connected
to the main p.c.b. ? (make sure that
the input selected is adequate for
the type of sensor installed with
respect to the signal type and range
specified).
All screw terminal connections prop-
erly tightened?
Have all electrical cable and plug
connections been properly tighte-
ned?
Proper unit gounding made?
Summary of Contents for FlexLine FLH03
Page 1: ...FlexLine Electric Heater Steam Humidifiers ÁFLH ENKÈ FLH EN E 8881164 Manual ...
Page 45: ...Page 45 11 Declaration of Conformity ...
Page 49: ...Page 49 This page intentionally left blank ...
Page 50: ...Page 50 This page intentionally left blank ...